ORDINARY MEETING AGENDA 15 NOVEMBER 2018
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a
waterway
55. The basement must be designed and constructed as a water excluding structure
in accordance with Australian Standard AS3735 "Concrete Structures for
Retaining Liquids" to ensure groundwater does not enter the basement after
construction is completed.
56. All treated material must undergo verification testing at the rate of one sample
per 250m3 throughout the duration of the excavation phase of the
development. The verification testing must be undertaken by a qualified
person* using the SPOCAS or Chromium Reducible Sulphur testing suite,
and the results must be submitted to Council for appraisal.
Electricity and Telecommunication Services
57. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
58. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
59. All earthworks must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
60. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
61. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department
of Transport and Main Roads (DTMR) for any works on State
controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
Page 31 of 47