2018-11-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 NOVEMBER 2018
d. a 3.0 metre wide vegetated screening of northern elevation of the northern
pavilion from the adjoining properties in Anne Street, designed such that
vegetated screening will be provided within 3 years of the plantings occurring.
e. vegetated screening of the acoustic barrier adjacent to the western boundary in
accordance with the conditions of this Decision Notice
f. vegetated screening of any electrical transformers, bin storage areas and the like
from the road frontage
g. provision of 1 street tree within the road reserve for every 8 metres of road
frontage
15. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Street Identification
17. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
18. The building entrance or reception area must be clearly visible and identifiable from the
street or otherwise provided with signage and lighting at strategic locations to direct
people to the building entrance.
Water & Sewer Connections
19. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
20. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Building Appearance
21. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
22. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like, except where required to
satisfy any privacy condition of this Decision Notice.
Advertising Devices
23. Advertising devices must comply with the requirements of the Advertising Devices
Code.
Page 39 of 47