                     Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                      Revision No: 1     Printed Date: 1
                       KHODR CIVIL PTY LTD                                                            Initial            19/02/2025

KHODR CIVIL PTY LTD               Location of Works        Phone:                            Document Developed By:      Ghassan khodr
535-541 AHERNS ROAD                                        Fax :97881577
CONONDALE QLD 4552              16-120 POINCIANA           Mobile: 0416 444 433              In Consultation With:       Ghassan khodr
                               AVE, TEWANTIN QLD
                               4565 Fore Group
This SWMS has been developed as a generic document for the safety aspects and impacts of the Demolition Works as they are understood at the
time of writing. Prior to any work commencing all relevant information on this page must be completed and signed by the appropriate parties and a
copy of the SWMS supplied to those listed in the document control section of the Safety Management Plan.

This SWMS is to be further developed for site-specific issues in consultation with the employees carrying out the work. The agreed safe work
methods will be documented on a daily Job Safety Analysis and signed by all carrying out the work before they commence work.
                       KHODR CIVIL PTY LTD                                                                  Contractor
                     Print Name           Signature               Date                            Print Name           Signature          Date
Document                                                                       Contractor       Blade shooks
Authorised By                                                                  Representative
Approval of        GHASSAN                                 19/02/2025          Acceptance of
SWMS                                                                           SWMS
SWMS                                                                           SWMS
Withdrawn                                                                      Withdrawn
Work Activity                                                                  Work Activity
Completed                                                                      Completed
                                                           Principle Contractor Details
   Site Specific                        OHS Coordinator                                                    Project Manager
 Issues Reviewed
        By
                        Print Name               Signature              Date              Print Name               Signature             Date
Acceptance of this GHASSAN KHODR
WMS
WMS Withdrawn
Work Activity
Completed
Log in to download the original file

SafeWorkMethodStatement QLD Demolition.pdf · 170 KB (small file)

Full text of the other 14 pages

Page 2

                       Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                               Revision No: 1       Printed Date:    Page 2
                       KHODR CIVIL PTY LTD                                     Initial              19/02/2025

Introduction                                      3              Manual Handling                                         3
Noise Control                                     4              Hazardous substances                                    4
Working at Heights                                4              Hazard Identification and Risk Assessment               5
Work Step                                         5              Hazard Identification                                   5
Risk Assessment                                   6              OHS Control Methods                                     6
Hierarchy of Control                              6

Demolition                                        7
1. General Planning                                         2.   Planning by Principal contractor or Subcontractor
3. General Planning by Demolition subcontractor             4.   Check Disconnection of Services
5. Removal of Existing Ceilings                             6.   Demolition of walls & roof by machine
7. Removal of Floor Finishes                                8.   Stability of operating plant
9. Loading & Disposal of Demolished Materials

Page 3

                       Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                                  Revision No: 1      Printed Date:      Page 3
                          KHODR CIVIL PTY LTD                                                                     Initial             19/02/2025
Introduction

In order to meet its Legislated, Regulatory and Contractual responsibilities and obligations in the first instance and more importantly to provide for the safety
health and welfare of its employees and others in its workplace, KHODR CIVIL PTY LTD will ensure all work is carried out in accordance with a relevant and
current SWMS.

The work to be undertaken is Demolition.

KHODR CIVIL PTY LTD employees and sub-contractors will meet the following criteria before starting the work described in this SWMS:
   Be skilled and competent to carry out the work allocated to them;
   Possess Construction Industry General Induction Training Certificate;
   Possess all WorkCover certificated of competency required to carry out the work allocated to them;
   Have completed the Principal Contractors safety induction training;
   Have been trained in the requirements of this SWMS and successfully completed a competency questionnaire; and
   Participate in the documentation of the Principal Contractors Daily Job Safety Analysis form before starting work each day or whenever conditions
     change requiring the issue of another Job Safety Analysis.

This SWMS will be reviewed KHODR CIVIL PTY LTD employees and others who may be impacted by the works in progress and its associated risks.

The revised SWMS will be presented to the Principal Contractors Safety Coordinator for acceptance prior to any work commencing under the revised SWMS.
No work will commence under the revised SWMS until all employees and sub-contractors have been trained and understand the new conditions.
Manual Handling

Manual Handling activities are a significant part of most work activities. All manual handling will be carried out in accordance with the conditions of the
National Standard and Code of Practice for manual handling. Supervisors will be trained in manual handling hazard identification risk assessment and the
development of safe manual handling plans. Supervisors will consult with management and employees in the development of these plans and communicate them
to the employees before they commence any manual handling activities covered by SWMS. All manual handling safety plans will be included in the relevant
sections of the SWMS.
The basic requirements for safe manual handling are:

Face the direction you are going to move the load if possible. Take a firm grip on the object. Bend the knees and use legs to lift. Keep arms straight and hold the
load close to the body. Turn feet in the direction of travel, do not twist the body. Use team lifting methods or mechanical lifting equipment for lifting heavy
loads. When using the team lifting method on member should be nominated as the team leader and the lift made on his count.

Page 4

                      Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                               Revision No: 1       Printed Date:     Page 4
                        KHODR CIVIL PTY LTD                                                                    Initial              19/02/2025
Noise Control
Noise levels near or above the threshold limit value of 85dBa could be generated at various times throughout the work. KHODR CIVIL PTY LTD will
identify these potentially harmful noise levels when or before they occur and if they cannot be eliminated require those carrying out the work and those in the
near vicinity to the work and impacted by the noise to wear approved hearing protection.
KHODR CIVIL PTY LTD will use one or a combination of the hierarchy of hazard controls where possible to reduce the noise levels and use PPE as a final
protective measure.
KHODR CIVIL PTY LTD will supply their employees with hearing protection and provide training in its proper use, fitting, wearing, storage, care and
maintenance. Records of issue and training will be maintained by KHODR CIVIL PTY LTD in the appropriate registers, kept on site and made available for
inspection on request by the Principal Contractor.

The general rule of thumb for wearing Hearing Protection is when noise levels require you to raise your voice to be heard by someone standing with you, then
Hearing Protection is needed.
Hazardous Substances
All hazardous substances to be used during the works under this SWMS will be notified to the Principal Contractor prior to being brought on site and a current
Material Safety Data Sheet (MSDS) will be provided by KHODR CIVIL PTY LTD .
A register of hazardous substances in use on site shall be created and maintained in an up-to-date condition on site at a central location. Individual MSDS will
be available to those using the hazardous substances at the point of use.
All employees who will use, store, transport, decant or label hazardous substances will be trained in the content of the MSDS.
KHODR CIVIL PTY LTD will supply their employees with PPE and Safety equipment and train them in its proper use, fitting, wearing storage, care,
cleaning and maintenance.
KHODR CIVIL PTY LTD site manager and supervisor will monitor the use of hazardous substances and the appropriate PPE and safety equipment.
Working at Heights
Working at heights involves working from scaffolding, ladders, step ladders, elevating work platforms and from roofs or high ground where the person
carrying out the work can fall 2 metres or greater.
Ladders are not work platforms and must not be used as one.
More detailed information can be found in the relevant sections of this SWMS dealing with the work steps that require work to be carried out at height.
Where an elevated work platform is used to access a roof or other work area where the worker can fall 2 metres or more, the person leaving the EWP to access
the other area must wear a harness with double lanyard and have at least one lanyard attached to an approved anchor point at all times.
Working and walking backwards when working at heights greater than 2 metres should be avoided at all times.

Page 5

                       Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                            Revision No: 1     Printed Date:    Page 5
                         KHODR CIVIL PTY LTD                                                                Initial            19/02/2025

                                                     Hazard Identification and Risk Assessment
                                                                      Work Step
The work step is an individual task performed in combination of tasks that collectively make up the job of work. For instance filling the mower with
fuel, checking the oil, setting the cutting height, attaching the grass catcher, starting the mower are some of the work steps in the Job of mowing the
lawn.
The SWMS lists the tasks sequentially that are required to carry out the job for which the SWMS is written.
                                                                Hazard Identification
  The section OHS Hazards lists those ‘things’ in relation to a specific work step that have the potential to cause illness injury or damage to people,
  plant, equipment or property. The hazard could be the system of work or a piece of plant, equipment, substance or other energy form which has or
 may have the potential to cause harm – the hazard is ‘what’ could hurt you. The following table lists the common forms of energy and examples of
                                                                      their source.
    Potential energy – Ladders, lifts, hoists, scaffolding i.e.        Thermal energy – high and low temperatures
       falls by people or materials                                     Pressure energy – Pressurisation and Pneumatic Equipment and systems, gas
    Kinetic Energy – plant, equipment in motion i.e. struck-              cylinders
       by                                                               Acoustic energy – ambient noise or noise generated by work.
    Mechanical energy – machine guarding, unexpected                   Radiation energy – solar oar radiation from welding, x-rays
       start – up or shut down of machinery                             Bio mechanical energy – manual handling, lift, push, pull, carry or restrain
    Electrical energy – Cables and wiring, Control devices,            Microbiological energy – infectious materials, blood born pathogens, needle
       Conductors, Switchboards and Switchgear, Electrical                 stick injuries
       appliances, Welding and electricity.
    Chemical energy – flammables, combustibles,
       corrosives and toxic
Risk Assessment
Risk is a measure of “How” the hazard could hurt you or cause damage. Most hazards can have more than one way of causing harm or damage. There
may be none, all or some of these present and in varying degrees. It is important therefore to recognize the amount of risk the hazard represents to us
in any given situation.
Depending on the combination of situation, exposure and severity of outcome measured against the likelihood of an unwanted event occurring we can
measure and rank the amount of risk. This is done by using the following risk matrix and recording the result in the “Risk Score Column”.

Page 6

                       Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                            Revision No: 1     Printed Date:    Page 6
                         KHODR CIVIL PTY LTD                                                                Initial            `19/02/2025

                                                                    Risk Matrix
                                                                          Likelihood
                                             Risk to People         Very Likely           Unlikely      Very
                                                                    Likely                             Unlikely

                               Severity
                                                Fatality              1    1                  2           3
                                          Major Injury Possible       1    2                  3           4
                                             Minor Injury             2    3                  4           5
                                           Negligible Injury          3    4                  5           6
                                                              OHS Control Methods
Measuring the amount of risk helps in prioritizing and determining the control methods to use to provide the best protection for people, plant,
equipment and property. The following hierarchy of controls must be used when determining the bet methods of controlling the risk associated
with the identified hazards.
Once the control methods have been determined the risk assessment is carried out again and the risk score recorded in the residual risk score
column. It is important to take this step. Firstly to ensure that no additional risks have been created by the control methods and secondly, to show
the reduced level of risk still existing at the time the work is done.
                                                                   Hierarchy of Control
1. Any obligation under OHS Regulation 2001 to control a risk by taking specific risk control measures, or by taking specific risk control
   measures in a particular order, is in addition to the obligations referred to in the Hierarchy of Controls.
2. To control a risk to health or safety (in any case in which the elimination of the risk is not reasonably practicable) we must take the following
   measures (in the order specified) to minimize the risk to the lowest level reasonably practicable:
        Firstly, substituting the hazard giving rise to the risk with a hazard that gives rise to a lesser risk,
        Secondly, isolating the hazard from the person put at risk,
        Thirdly, minimizing the risk by engineering means,
        Fourthly, minimizing the risk by administrative means (for example, by adopting safe working practices or providing appropriate
   training, instruction or information),
        Fifthly, using personal protective equipment.
3. A combination of the above measures is required to be taken to minimize the risk to the lowest practicable if no single measure is sufficient for
   that purpose.

Page 7

                     Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                      Revision No: 1     Printed Date:   Page 7
                      KHODR CIVIL PTY LTD                                                             Initial            19/02/2025


      Work Sequence                       Potential Hazards                                    Potential Risk                            Risk Score
1.1 General Planning            1.1 Inadequate training, planning and  1.1 Task specific injuries due to inexperience or failure to          1
                                   improvisation                          provide appropriate equipment
                                                          Control Method                                                                 Residual
1.1 Ensure the people carrying out the work are skilled and competent enough to safely carry out the work.                                    4
     Ensure there is enough competent supervision.
     Plan for the required equipment hire.
      Work Sequence                       Potential Hazards                                    Potential Risk                            Risk Score
2.1 Planning by Principal       2.1 Insufficient Lighting              2.1 Walk into objects, slips, trips, and falls and other              1
   Contractor or                2.2. Poor access to work areas               injuries.
   Subcontractor                2.3 Lack of adequate ventilation       2.2 Slips, trips and falls; abrasions, strains and sprains;            4
                                2.4 Working at height near edge           manual handling injuries e.g. back damage.
                                2.5 Penetrations not covered           2.3 Illness; breathing difficulties – overcome by fumes.               2
                                2.6 Formwork inadequate                2.4 Fall from edge                                                     2
                                                                       2.5 Fall through penetration                                           3
                                                                       2.6 Fall injury due to formwork failure                                3
                                                         Control Method                                                                  Residual
 2.1 Provide artificial light at the work face in enclosed areas where natural light is reduced to levels considered too low to work          4
safely.
     Ensure access ways are adequately defined and lighted
2.2 Maintain good housekeeping practices.                                                                                                     5
     Keep area around work area (min 550 mm wide) clear of stored materials and/or rubbish.
     Provide adequate access and egress for demolishers and their equipment.
     Do not commence demolishing in an area where the deck is incomplete and or other traders are still working.

Page 8

                     Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                    Revision No: 1     Printed Date:       Page 8
                     KHODR CIVIL PTY LTD                                                            Initial            19/02/2025

                                                         Control Method                                                                  Residual
2.3 Limit fuelled equipment operating in confined areas such as basements or below ground car parks.                                         4
    Consider the location and operation of fuelled equipment to prevent running continuously in the immediate vicinity of the work
    area.
    Fit exhaust stack, scrubber or catalytic converter to equipment.
    Locate equipment to prevent constant wind blowing fumes towards work area if possible.
2.4 Provide perimeter handrail or midrail of suitable strength and stability and ensure they remain in place.                                4
    Ensure gaps in perimeter have protection, e.g. between screen or edge scaffold.
    Provide a catch scaffold in accordance with the Regulation.
2.5 Provide covers for penetration with catches to secure them in the closed position.                                                       4
    Inspect area before the demolition work.
    Work Sequence                         Potential Hazards                                        Potential Risk                        Risk Score
3. General Planning by      3.1 Exposure to ultra violet light and glare.    3.1 Skin cancer, sunburn and eye damage                         3
    Demolition              3.2 Skin, eye contact with dust.                 3.2 Skin rash or allergy/dermatitis; dust in eyes or ears       4
    Contractor              3.3 Hot weather.                                 3.3 Dehydration and dizziness                                   4
                            3.4 Manual Handling.                             3.4 Strains, Sprains and back injuries                          4
                                                         Control Method                                                                  Residual
3.1    Wear personal protective equipment:                                                                                                   6
       Long sleeved shirt, long legged trousers, flap on hard hat and SPF 30+ sunscreen
       Wear Australian Standard rated sunglasses
3.2    Ensure a supply of fresh, cool water is supplied to the work force suitable for flushing eyes.                                        6
       Ensure suitable eye protection is provided and worn for tasks where dust can occur.
       Ensure suitable PPE is supplied and worn.
       Supply and use barrier cream or similar.
3.3    Ensure an adequate supply of cool drinking water is available to the work force.                                                      6
       Provide shaded rest areas and job rotation to prevent heat exhaustion.
3.4    Use only mechanical aids designed for the purpose of crushing, lifting, placing and removing demolished materials.                    6
       Take breaks when repetitive lifting, pushing pulling, carrying or restraining heavy loads occurs.
       Rotate jobs to minimize manual handling risk exposure.

Page 9

                   Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                Revision No: 1   Printed Date:     Page 9
                   KHODR CIVIL PTY LTD                                                          Initial          19/02/2025

   Work Sequence                 Potential Hazards                                       Potential Risk                          Risk Score
4. Check                 4.1    Electricity                      4.1    Electrocution                                                1
   disconnection of      4.2    Gas                              4.2    Inhalation / Explosion / Fire / Burns                        1
   Services              4.3    Water                            4.3    Flooding                                                     1
                                                       Control Method                                                            Residual
4.1    Disconnection by Principal Contractor                                                                                         5
       Certification of disconnection to be given to demolition contractor
4.2    Disconnection by Principal Contractor                                                                                         5
       Certification of disconnection to be given to demolition contractor
4.3    Disconnection by Principal Contractor                                                                                         5
       Certification of disconnection to be given to demolition contractor

   Work Sequence                 Potential Hazards                                       Potential Risk                          Risk Score
5.  Removal of           5.1   Falling objects                   5.1    Cuts and abrasions                                           3
    existing ceilings    5.2   Falling Personnel                 5.2    Broken bones                                                 3
    & ceiling            5.3   Dust                              5.3    Inhalation, eye damage, ear damage.                          2
    structures
                                                       Control Method                                                            Residual
5.1   Dust masks to be worn while removing ceilings                                                                                  5

      Area to be closed to the public
      Area to be closed to non essential workers                                                                                     5
      Ensure correct PPE for the required task is supplied and used at all times                                                     4
5.2   Ladders and access scaffolds to be braced and on suitable footing
5.3   Control methods as per 5.1
      Materials to be handled in a workmanlike manner
      Materials to be stockpiled in an orderly manner.
      Provide clean, fresh water for flushing eyes at the workplace.

Page 10

                       Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                  Revision No: 1     Printed Date:     Page 10
                     KHODR CIVIL PTY LTD                                                          Initial            19/02/2025

   Work Sequence                        Potential Hazards                                     Potential Risk                         Risk Score
  6.     Removal of walls   1.1         Falling objects                  6.1     Cuts and abrasions                                      3
       and roof by machine. 1.2         Dust                             6.2     Inhalation, eye damage, ear damage                      2
                            1.3         Sharp objects                    6.3     Cuts and abrasions                                      4
                            1.4         Noise                            6.4     Hearing impairment                                      2
                            1.5         Unstable surface                 6.5     Tripping, slipping, sprains & strains                   2
                                                           Control Method                                                            Residual
6.1      Area to be closed to the public                                                                                                 5
         Area to be closed to non essential workers
6.2      Ensure correct PPE for the required task is supplied and used at all times                                                      5
         Provide clean, fresh water for flushing eyes at the workplace
6.3      Materials to be handled in a workmanlike manner                                                                                 6
         All sharp edges to be capped with suitable capping; nails removed or bent over
         Demolish building in accordance with AS 2601-2001
6.4      Ensure correct PPE for the required task is supplied and used at all times                                                      5
6.5      Take extra caution in the work area                                                                                             4
         Maintain good house keeping practices
         Materials to be stockpiled in an orderly manner
6.6      Water shall be applied for dust suppression within & outside the site                                                           5
6.7      If asbestos material is found in the subfloor space of the demolished building air safe monitoring, hazardous material          5
         procedures for asbestos shall be implemented and an asbestos clearance report provided upon completion.
       Work Sequence                     Potential Hazards                                    Potential Risk                         Risk Score
7.       Stability of operating   7.1    Roll over crushing operator     7.1     Fatal injuries                                          1
plant
                                                           Control Method                                                            Residual
7.1      Inadequate foundation for operating plant.
7.2      Subsidence or collapse of earth or rubble below or adjacent to plant.
7.3      Plant operating too close to an excavation, basement or trench.
7.4      Plant inclined beyond safe operating limits.
         .

Page 11

                      Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                            Revision No: 1   Printed Date:    Page 11
                   KHODR CIVIL PTY LTD                                                      Initial          19/02/2025

      Work Sequence                Potential Hazards                                 Potential Risk                          Risk Score
8.      Plant or           1.1     Person/s stuck by debris   8.1     Cuts and abrasions                                         2
equipment generated                flung out from plant
projectiles.
                                                      Control Method                                                         Residual
8.1     Poor housekeeping around plant and equipment.
8.2     Debris spun off machinery wheels or tracks
8.3     Shattered concrete or masonry breakage when using hammers of picks
8.4     Unauthorised persons wander into work area
8.5     Operator not adequately protected


      Work Sequence                 Potential Hazards                                 Potential Risk                         Risk Score
9.      Loading and          9.1     Dust                       9.1    Inhalation, eye damage, ear damage                         4
        disposal of          9.2     Material falling from      9.2    Cuts and abrasions                                         4
        demolished                   containers
        Materials
                                                      Control Method                                                          Residual
9.1     Cover load on trucks or bins                                                                                              6
        Area to be closed to the public
        Area to be closed to all non essential workers
        Ensure correct PPE for the required task is supplied and used at all times.
9.2     Control methods as per 20.1                                                                                               6
        All works to be carried out to AS 2601-2001 and current OH&S regulations. QA Standard to AS9002-2000.

Page 12

                 Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                   Date Printed:         Page 12
            KHODR CIVIL PTY LTD                                                                    19/02/2025
                                                            Training
Names of persons who will or have been trained in the work activities described in this WMS and the names and position of those who
                                                         will train them.
                           Trainee                                                        Responsible Trainer
Name        Company                   Training Signature           Date Trained      Name           Position         Signature

Page 13

                  Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                              Revision No: 1         Date Printed:        Page 13
               KHODR CIVIL PTY LTD                                            Initial:               19/02/2025
 The following personnel have responsibility of the work and the inspection and approval of the work areas, work methods, protective
                                             measures, plant equipment and power tools.
Name                       Position                            Signature                              Company
                           Site Manager                                                               KHODR CIVIL PTY LTD




Permits Required: Yes No                                        Yes   No                                                    Yes No
Daily SWMS               Physical Isolation (Gas, Water, Sewer)                                      Electrical Isolation
Confined Spaces
                                              Additional Heath & Safety Precautions
Training Required               Yes No                Yes No                        Yes No                              Yes No
Construction Industry Induction        Site Induction            Tool Box Meetings                   Task Specific
     (Green Card)
Manual Handling                        PPE                       Noise                               Confined Space

Other

Page 14

                    Safe Work Method Statement –– 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                  Revision No: 1   Printed Date:   1of 2
                       KHODR CIVIL PTY LTD                                                        Initial          19/02/2025


ASBESTORS PROCEDURE

Identified areas of hazard
Refer to Risk Assessment Statement prepared by ghassan khodr- LICENSED ASBASTOS ASSESSOR NO: LAA001407

General Precautions

        Warning signs and barriers to be erected
        Asbestos removalists to be the only personnel in contaminated areas
        Personnel in contaminated areas to wear adequate protection for the risk factor
        Hand tools and NOT power tools to be used
        Wet materials where possible
        Polythene barrier curtains to separate contaminated from uncontaminated areas
        When impervious overalls are to be used then the following are to be closely monitored

Heat Exhaustion – Heat Cramps – Heat Stroke SYMPTOMS
        Fatigue
        Headache
        Dizziness
        Shifts of vision
        Nausea
        Vomiting
        Loss of appetite
        Shortness of breath
        Fast heart rate
        Flushing of face or neck
        Glazed eyes
        Fainting

Page 15

                      Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
                                                                                                           Revision No: 1     Printed Date:       1 of 1
                        KHODR CIVIL PTY LTD                                                                Initial            11/05/2023


ASBESTORS PROCEDURE

Safety Precautions

        Remove worker from work area
        Remove impervious overall
        Cool them down
        Give them 500ml of water to drink
        Get the person to a doctor
        Check other workers for the symptoms


Specific Procedures

        All general precautions to be followed
        It is important to remove asbestos waste from the work area and transport to the disposal bin without any spills, leaks or transfer of
         contamination
        All materials to be double bagged
        All bags to be clearly labeled
        All materials to be stockpiled after bagging to ensure material is transported all in the same time period
        Wheelbarrows used for transportation not to be allowed in contaminated areas
        Bagged materials to be loaded into wheelbarrows
        Materials to be transported to the disposal bin by nearest route
        Materials to be carefully loaded into disposal bin to prevent bag breakage
        Bin to be transported to an approved EPA disposal site

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.