SafeWorkMethodStatement QLD Demolition
Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
Revision No: 1 Printed Date: Page 2
KHODR CIVIL PTY LTD Initial 19/02/2025
Introduction 3 Manual Handling 3
Noise Control 4 Hazardous substances 4
Working at Heights 4 Hazard Identification and Risk Assessment 5
Work Step 5 Hazard Identification 5
Risk Assessment 6 OHS Control Methods 6
Hierarchy of Control 6
Demolition 7
1. General Planning 2. Planning by Principal contractor or Subcontractor
3. General Planning by Demolition subcontractor 4. Check Disconnection of Services
5. Removal of Existing Ceilings 6. Demolition of walls & roof by machine
7. Removal of Floor Finishes 8. Stability of operating plant
9. Loading & Disposal of Demolished Materials