Original source · versioned page text
SafeWorkMethodStatement QLD Demolition
Safe Work Method Statement – 16-120 POINCIANA AVE, TEWANTIN QLD 4565
Revision No: 1 Printed Date: 1 of 1
KHODR CIVIL PTY LTD Initial 11/05/2023
ASBESTORS PROCEDURE
Safety Precautions
Remove worker from work area
Remove impervious overall
Cool them down
Give them 500ml of water to drink
Get the person to a doctor
Check other workers for the symptoms
Specific Procedures
All general precautions to be followed
It is important to remove asbestos waste from the work area and transport to the disposal bin without any spills, leaks or transfer of
contamination
All materials to be double bagged
All bags to be clearly labeled
All materials to be stockpiled after bagging to ensure material is transported all in the same time period
Wheelbarrows used for transportation not to be allowed in contaminated areas
Bagged materials to be loaded into wheelbarrows
Materials to be transported to the disposal bin by nearest route
Materials to be carefully loaded into disposal bin to prevent bag breakage
Bin to be transported to an approved EPA disposal site