2 February 2022

SCG Ref: 31073(L2)



By email: [email protected]



F & M De Pasquale
c/- Martoo Consulting




Dear Sir/Madam



              Re: Council Information Request OPW21/0315 ~ 33 Wyuna Drive, Noosaville

This letter is in response to Noosa Council’s Information Request dated 22/11/2021 and we have addressed the
engineering components of this information request and respond as follows: -

Issue 1 – Dewatering

      a) Additional soil testing has been conducted by Douglas Partners following the demolition of the existing
      dwelling. Please refer to the amended Geotechnical report attached, Douglas Partners project
      95120.01.R.001 dated 1 February 2022.

      b) The proposed building plans consist of excavations up to 3m below existing ground levels in an Acid
      Sulphate Soil (ASS) Hazard Overlay Zone (5m AHD or below). Therefore, the disturbance of potential acidic
      soils cannot be avoided. Any exposed ASS as a result of excavations are to be treated in accordance with
      the site-specific ASS management recommendations as described in Douglas Partners Geotechnical report
      project 95120.01.R.001 dated 1 February 2022

      c) As the supervising RPEQ, SCG Consulting Engineers will undertake numerous site inspections
      throughout construction including, but not limited to; initial pump out, basement foundations, block work,
      suspended slabs etc. Douglas Partners as the Geotechnical engineer will also undertake inspections and
      testing following basement excavations prior to slab preparations. Additionally, the appointed piling and
      dewatering contractor will provide design and installation certification (Form 15 & 16) of the works, as well
      as frequent on-site inspections and testing whilst the site is dewatered.

      d) The dewatering methodology proposed will consist of dewatering spears installed to the inside the
      proposed concrete piled retention (cut-off) wall this will maintain groundwater levels outside the proposed
      piling walls to existing levels resulting in little to no drawdown of the water table outside the excavation
      footprint. Dilapidation reports for both neighbouring properties have been conducted by Building Inspections
      Noosa, refer attached.
Full text of the other 1 page

Page 2

       f) As per Item 1d, the concrete pile retention is to be constructed on the property boundary and therefore,
       external monitoring bores cannot be installed ddue to limited space.

Issue 2 – Dewatering

       c) A building contract will not be awarded until all development approvals are in place, therefore a specialist
       piling, and dewatering contractor is yet to be appointed. All on site dewatering will be in accordance with
       the dewatering management plan prepared by ADG Consulting. We request for this information to be
       provided to Noosa Council prior to installation.

       d) As per Item 2c, ADG Consulting have amended the dewatering management plan to show approximate
       tank locations. Any additional tanks required that cannot be accommodated within the property boundary
       will seek a road reserve permit from Noosa Council.

       f) The proposed dewatering system is powered by Three Phase electric motors which are far less noisy
       than diesel pumps and generators. This will be accompanied with acoustic matting to further absorb any
       noise from the electric pumps.

Issue 3 – Stormwater Management

       Internal drainage design is to be completed by a hydraulic consultant in accordance with the National
       Construction Code (NCC) 2019 - Volume 2 and AS 3500.3.2-2018 – Stormwater Plumbing and Drainage.
       We have amended our Stormwater Management Plan (SCG Drawing No. 31073-SW1.1) to note, all roof
       drainage is to be connected to the Wyuna Drive kerb and channel in accordance with the Noosa Plan to
       Council standard detail IPWEA RS-081.

Should you require any further information, please do not hesitate to contact this office.



Yours faithfully




                                                                    Checked by

TOM HARRINGTON                                                      SEAN RICHARDSON – RPEQ 5835
For and on behalf of                                                for and on behalf of
SCG CONSULTING ENGINEERS                                            SCG CONSULTING ENGINEERS


Enc      Douglas Partners report 95120.01.R.001
         Building Inspections Noosa, report for 35 Wyuna Dr, Noosaville dated 10/11/21
         Building Inspections Noosa, report for 29-31 Wyuna Dr, Noosaville dated 10/11/21




SCG Consulting Engineers                              Page 2 of 2                                   SCG Ref: 31073(L2)

Used in these records

About this file

File size
619 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response 22.02.02 From SCG - 31073(L2).pdf · 619 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.