Council archive · source document
Response 22.02.02 From SCG - 31073(L2) · OPW21/0315
f) As per Item 1d, the concrete pile retention is to be constructed on the property boundary and therefore,
external monitoring bores cannot be installed ddue to limited space.
Issue 2 – Dewatering
c) A building contract will not be awarded until all development approvals are in place, therefore a specialist
piling, and dewatering contractor is yet to be appointed. All on site dewatering will be in accordance with
the dewatering management plan prepared by ADG Consulting. We request for this information to be
provided to Noosa Council prior to installation.
d) As per Item 2c, ADG Consulting have amended the dewatering management plan to show approximate
tank locations. Any additional tanks required that cannot be accommodated within the property boundary
will seek a road reserve permit from Noosa Council.
f) The proposed dewatering system is powered by Three Phase electric motors which are far less noisy
than diesel pumps and generators. This will be accompanied with acoustic matting to further absorb any
noise from the electric pumps.
Issue 3 – Stormwater Management
Internal drainage design is to be completed by a hydraulic consultant in accordance with the National
Construction Code (NCC) 2019 - Volume 2 and AS 3500.3.2-2018 – Stormwater Plumbing and Drainage.
We have amended our Stormwater Management Plan (SCG Drawing No. 31073-SW1.1) to note, all roof
drainage is to be connected to the Wyuna Drive kerb and channel in accordance with the Noosa Plan to
Council standard detail IPWEA RS-081.
Should you require any further information, please do not hesitate to contact this office.
Yours faithfully
Checked by
TOM HARRINGTON SEAN RICHARDSON – RPEQ 5835
For and on behalf of for and on behalf of
SCG CONSULTING ENGINEERS SCG CONSULTING ENGINEERS
Enc Douglas Partners report 95120.01.R.001
Building Inspections Noosa, report for 35 Wyuna Dr, Noosaville dated 10/11/21
Building Inspections Noosa, report for 29-31 Wyuna Dr, Noosaville dated 10/11/21
SCG Consulting Engineers Page 2 of 2 SCG Ref: 31073(L2)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response 22.02.02 From SCG - 31073(L2).pdfRelated documentApplication case desk ↗
22.02.02 From SCG - 31073(L2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 619 KB (small file)
- File type
No other editions are linked here.