Callaghan & Toth 24-4-14 Response to Information Request
Attached to the e-mail REC13/0146 - Response to Information Request - Email 1.
extent of earthworks and western tributary plan, long section, and cross-sections in Figures 9, 10, and 11 of the flood study showing the minor reshaping of the channel. Natural channel design principles will be incorporated in the reshaping of the tributary and features will include: e Arock lined invert approximately 1.5m wide e Removal of vegetation acting as weeds and currently clogging the watercourse e Plant out the banks that have been reshaped with groundcover and stabilising plants e.g. Lomandra spp to a density of one plant per 2m” e Retain existing trees in the riparian buffer areas e Infill planting in riparian areas to achieve a density of 1 plant per 1.5m” focusing on canopy and pioneer species to achieve shade cover of the watercourse. 17. Justification for any infrastructure / road within the riparian buffer area. Response: Even though there is some encroachment it is considered that the overall intent of the Biodiversity Overlay and mapped Riparian Buffer Areas is achieved on site by: e Maintaining a riparian corridor along both waterways, generally a minimum of 10m wide. In some areas the riparian buffer is much wider. e Existing native vegetation is to be protected. e Revegetating the riparian buffer areas on both waterways to maintain wildlife corridors. e Minimising encroachment into the riparian buffer areas. In some locations a 10m wide buffer is not achieved as shown in orange on plan 1225-33. o Lot 15: The defined bank is heavily vegetated with shrubs and mature trees at present, and Q100 flood level in contained in the bank. We have moved the rear boundary back as far as practical to allow the minimum 5m vegetated buffer from top of bank. o Proposed pedestrian footbridge on Eastern Tributary has been removed from riparian area. o Lot 26: We have allowed for a 3m wide grassed area behind the lot so Park maintenance access is provided. o Road 1 Road Reserve: Some minor areas have been removed where necessary for turfed sections beside the road. On plan 1225-45 the Typical Bio-retention Swale Detail shows that base of swale and batter on western tributary side are vegetated to form part of the riparian planting. The area of riparian buffer that could not be achieved as noted above has been offset by planting an area of the Eastern Tributary (see yellow areas on plan 1225-33). An offset planting area of 580sqm area has been used to offset the 340sqm shortfall. Road 1 centreline, Road Reserve and lots 17-20, 29 front boundaries have been moved approximately four metres further back from the Western Tributary to allow more riparian planting and move the road away from the banks. The road centreline and swale have also been curved to minimize tree removal. e Maintaining water quality by providing a stormwater treatment system that achieves best practice pollutant load reductions. X:JOBS\CT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondencelstage 3 & 4\Response to Info_Request_Jan2014.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.