Skip to the record
Every meeting, every word.

Original source · versioned page text

Callaghan & Toth 24-4-14 Response to Information Request

Attached to the e-mail REC13/0146 - Response to Information Request - Email 1.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

e Removing weed species within existing riparian vegetation during the revegetation of
these areas.

As detailed above the western tributary invert will be reshaped, lined with rock in the invert
and revegetated. The justifications for undertaking earthworks in the watercourse are as
follows:

e improve flood storage for the site,

e reduce maintenance requirements,

e remove mosquito breeding habitat, and

e improve drainage from Blue Wren Place which currently ponds.

See Drawing 1225-33 which shows the extent of earthworks in the western tributary plan,
long section, and cross-sections in Figures 9, 10, and 11 of the flood study showing the
minor reshaping of the channel.

Land Dedication

12. Provide a plan of areas to be dedicated unencumbered by services and service
easements and the like and showing:
g. Restoration of the mapped riparian buffer and areas below the Q100
h. Revegetation of the mapped riparian buffer and areas below the Q100.

Response:

Areas to be dedicated unencumbered by services and service easement includes:

e Total Passive Parkland without services or easements = 2.5Ha

e Total Active Parkland without services or easements = 622sqm (63 sqm sewer
easement)

e Total area of restoration (including weed removal and revegetation of riparian buffer
areas) = 12,500sqm

See Drawing Number 1255-33 which shows the dedicated areas to riparian buffer, in
accordance with Council’s Biodiversity Overlay.

Yours faithfully,
Callaghan & Toth

Vi

A D Toth BE Environmental RPEQ (Env)(civil) MIEAust CPEng NPER CPESC

Director
Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered

X:\JOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\stage 3 & 4\Response to Info_Request_Jan2014.doc
Log in to download the original file

Callaghan & Toth 24-4-14 Response to Information Request.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.