In relation to the request to make a minor change to the existing approval, Council on 30 September
2026, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 59.
C. Include additional condition 60.
D. Include an administrative change to the approval to include a new Reference Document
Section.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
1. The development of Precinct ‘D’ shall comply with all relevant conditions contained in the
overall rezoning approval R487 as amended, except as further modified herein.
2. For the purpose of these conditions, the following definitions apply: -
2.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be
endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
2.2. A Registered Professional Civil Engineer means an civil engineer who is listed under
the Institution of Engineers, Australia “National Professional Engineers Register 3”
(NPER 3) or an engineer who is registered in Queensland pursuant to the Professional
Engineers Act 1988.
2.3. Car parking area means a parking area as defined in the Schedule to the Shire of
Noosa Planning Scheme inclusive of manoeuvring areas and access from the
roadway.
2.4. The person acting on this permit means any person or company who undertakes
development pursuant to this permit.
2.5. AS2890.1–1993 refers to the Australian Standard for Off Street Car parking.
2.6. Principal Contractor means the person nominated by the Applicant and approved by
the Manager - Land Development at a pre-start meeting as being responsible for the
major component of works associated with a Development Permit for Operational
Works of any works on the site.
3. The lot reconfiguration shall be in accordance with plans GTP-D-PALMS-1A and GTP-D-
PALMS-2A, dated 17.1.2000, by Noosa Mapping & Surveys Pty Ltd, except as modified
herein.
4. The development may be undertaken in the following stages :-
• Stage 1 Lots 1-8, 25 to 32, Lots 37 to 46, Lots 65 to 68, and the balance lot.
• Stage 2 Lots 9 to 24, Lots 33 to 36, and Lots 47 to 64.
5. Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period is four
(4) years from the day this permit takes effect during which time all conditions must have
been complied with, operational works completed, and the Plan of Survey lodged with the
Council for endorsement.
6. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
7. Pursuant to Section 3.7.3.3(b) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
paid prior to endorsement of the Plan of Survey for each stage.
Page 2 of 12
Document Set ID: 25217809
Version: 7, Version Date: 07/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 152000.200053.3 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 192 KB (small file)
- File type
No other editions are linked here.