               8.     The lot layout for proposed Lots 39 to 55 shall be amended to accommodate a fire access
                      reserve of minimum width three (3) metres between lots 39 to 55 and the common property
                      boundary as it is defined on Noosa Mapping and Surveys Drawing Numbers GTP-D-PALMS-
                      IA and GTP-D-PALMS-2A dated 17.1.2000. Proposed Lots 39 to 55 are to be adjusted by
                      tapering to match the new boundaries of the adjoining lots, provided safe and convenient
                      access is constructed to the fire access reserve.
                      This fire access reserve is to be maintained in a mowed state. This requirement is to be
                      included in the Community Management Statement.
                      Fire Hydrants are to be installed in the fire reserve adjacent to the rear of Lots 39 to 55 as
                      prescribed by The Queensland Fire Service.
               9.     All residential buildings on Lots 39 to 55 on plans GTP-D-PALMS-1A and GTP-D-PALMS-
                      2A, dated 17.1.2000, by Noosa Mapping & Surveys Pty Ltd shall be set back a minimum of
                      6 metres from the common boundary of the lot and the fire access reserve required by
                      Condition 8, generally to the south-west. All fences and pools shall be set back a minimum
                      of 2 metres from the common boundary. Development Control By-laws under the Mixed Use
                      Development Scheme are to contain provisions that comply with this minimum standard.
               10.    For the following classes of work associated with development, a Development Permit for
                      Operational Works must be obtained prior to commencement of works relating to that class
                      of work. The application may combine any or all of these classes of work: -
                      10.1. Access and/or car parking
                      10.2. Site Civil Works
                      10.3. Roadworks
                      10.4. Stormwater Drainage
                      10.5. Frontage works
                      10.6. Sewer reticulation including new mains, relocations, diversions, pump stations and
                            rising mains
                      10.7. Water reticulation
                      10.8. Site Filling
                      10.9. Excavation of materials to fill another site
                      10.10. Landscaping
               11.    The person acting on this permit shall apply and obtain for all other necessary permits
                      including crane permits, road opening permits, hoarding permits, and/or any other approvals
                      required under any other Act.
               12.    Prior to commencement of work relating to a Development Permit for Operational Works, the
                      Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
                      pavement, footpath, kerb and gutter, or other Council property damaged as a result of
                      construction of the proposed development.
                      If any person acting under this permit damages any Council property or facilities (such as
                      underground drainage, water supply and sewerage) , through any cause whatsoever in the
                      course of, directly or indirectly carrying out development, that person shall forthwith notify the
                      Manager - Land Development and shall forthwith rectify that damage at its cost and to the
                      satisfaction of the Manager - Land Development. Alternatively, the Applicant may request
                      the Council to carry out the rectification works.
                      Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall
                      be undertaken by either Council or a Council approved contractor.
                      In all cases, Council reserves the right to carry out rectification works in an emergency and
                      where no reasonable attempt has been made to complete the rectification works as part of
                      the development.


                                                                                                         Page 3 of 12
Document Set ID: 25217809
Version: 7, Version Date: 07/10/2026

Used in these records

About this file

File size
192 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 152000.200053.3 (As Published).pdf · 192 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.