Minor Change Existing Approval - 152000.200053.3 (As Published)
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
13. All access roads and car parking shall be kept maintained and line-marked in a condition fit
for use to the reasonable satisfaction of the Manager - Land Development. A condition
requiring such proper maintenance shall be incorporated in the Community Management
Statement.
14. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment.
An estimate only of the contribution rates as of December 1999 under the current policies is
as follows:-
Water Supply $251,107
Sewerage $63,138
TOTAL $314,245
Headworks contributions must be paid prior to Council endorsement of the Plan of Survey.
Each additional lot shall be assessed as a dwelling house.
15. Concrete pedestrian paths and ‘Buggy Path’s throughout the development shall be designed
and constructed to the standards set out in the rezoning condition and to ensure pedestrian
safety using non-slip materials and to produce an evenly graded surface finish.
16. Access to each lot shall be constructed to Noosa Council standards and to the requirements
of the Manager - Land Development.
17. Battle axe lots shall have at least a 3.0 metre wide concrete driveway constructed within a
4.5 metre wide battleaxe access strip. All service conduits shall be installed for the full length
of the access strip prior to pavement construction.
18. No Council property or facility shall be interfered with during works associated with this
development.
19. All new roads shall comply with Queensland Streets, Noosa Springs Resort Master Street
Plan, and to Council's standards, including the provision of kerb and channel, asphaltic
concrete pavement and formed footpath.
20. The following steps shall be undertaken prior to commencement of any construction :-
20.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of
intention to commence works.
20.2. The Principal Contractor or any of his subcontractors shall not undertake any works
unless each contractor has public liability insurance in the sum of $10,000,000 and
copies of current public liability insurance policies are submitted to Council’s inspector.
20.3. The Principal Contractor shall nominate a site representative and give a telephone
number that can reach the site representative at any time during a 24-hour day.
20.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain
Council's requirements for construction of access.
20.5. All signage, including that for safety during construction, shall be in accordance with
the Manual of Uniform Traffic Control Devices and Department of Transport (Main
Roads Division) Roadworks Signing Guide.
20.6. The northern boundary of the common property along the top of the escarpment is to
be clearly marked, with such marking to be retained throughout the construction phase.
All persons on site are to be advised that this is a “No Disturbance” area, except as
permitted by these conditions.
Page 4 of 12
Document Set ID: 25217809
Version: 7, Version Date: 07/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 152000.200053.3 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 192 KB (small file)
- File type
No other editions are linked here.