Council archive · source document
Approved Decision Notice - MCU24 0089 & OPW24 0099 [As Published] · MCU24/0089
Plan No. Rev. Plan/Document Name Date
24.002 F Site Plan prepared by Kunkel Building 27 August 2024
Design
Sheet 1 of 2
24.002 F Floor Plan, Floor Framing Plan & 27 August 2024
Typical Section prepared by Kunkel
Sheet 2 of 2
Building Design
S01 A General Notes prepared by HR Design 3 April 2024
S02 A Bearer & Joists Layout prepared by HR 3 April 2024
Design
S03 A Connection Details prepared by HR 3 April 2024
Design
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 10 October
2026, unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The approved use is for one (1) Landing as defined by the Noosa Plan 2020 and is to be
used for private purposes only with no commercial operations to be undertaken.
5. The existing Landing (pontoon and gangway) is to be decommissioned and wholly removed
prior to the commencement of the use.
6. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2.
7. The use of the landing must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
8. Vessels berthed/moored at the Landing must be located a minimum of 3.0 metres from the
prolongation of the property boundaries, and clear of the fish habitat area.
9. Vessels must be connected directly to the Landing, and not located side by side or in tandem
with another vessel.
10. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
11. All structures must have no detrimental effects on stormwater drains and/or easements.
12. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
13. A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
design and in accordance with the approved plans.
Page 2 of 14
Document Set ID: 23303042
Version: 2, Version Date: 16/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Decision Notice - MCU24 0089 & OPW24 0099 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 885 KB (small file)
- File type