Original source · versioned page text
Minor Change Existing Approval 132002.220285.I (As Published)
98. Use the Australian Greenhouse Building Rating System (AGBR) scheme to rate the
greenhouse and energy performance for commercial/business precinct of the NSBC.
99. The developer shall prepare and implement a Building Energy Performance Management
and Monitoring Plan (“BEPMMP”) to the reasonable satisfaction of the Manager Land Use,
dealing with programmed time controlled scheduling for all areas capable of separable
operation, demand management, trend logging, energy usage monitoring and reporting and
exception events reporting. The developer shall report to the Council in writing the results of
the monitoring of performance against the BEPMMP on the first, second and third
anniversaries of the commencement of use Stage 1 of the NSBC. The report shall note the
strategies and recommendations of the Parsons Brinckerhoff report (April 2003) that have
been carried through to the development.
100. Deleted.
101. The proposed wind catcher ventilation shafts shall be designed to achieve optimal internal
ventilation of buildings consistent with acceptable standards of comfort.
102. The developer will design tenancy agreements to ensure that any self-contained commercial
refrigeration used on site will meet any mandatory minimum energy performance standards
for self-contained commercial refrigeration to be introduced from July 2005. The developer
will also design tenancy agreements to ensure that in general all appliances used on site are
as energy efficient as possible.
Waste Management & Recycling
103. The applicant must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers for each building complex. A wash down area is required
with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be
designed to prevent stormwater entry to the sewerage system.
104. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
105. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a forward
direction.
106. The applicant is to ensure that operational procedures are in place for the prevention of wind
blown litter on the site during both the construction and operational phases of the
development.
107. Street litterbins and recycling bins to a design approved by Council, shall be supplied and
installed at the applicants expense at agreed locations.
Page 18 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.