Original source · versioned page text
Minor Change Existing Approval 132002.220285.I (As Published)
171. The applicant will design and construct the external pathways for cycles and pedestrians on
Eenie Creek Road from Noosa Eumundi Road to the SBC access as part of this
development.
Stormwater Drainage & Water Quality
172. A Stormwater Management Plan for the site including revegetation and remediation shall be
prepared and submitted prior to the issue of a development permit for operational works to
the reasonable satisfaction of the Manger Land Development. The Stormwater Management
Plan shall be generally in accordance with URS’s Report of 19 June 2003” and include “and
shall be implemented by the applicant.
173. The Stormwater Management Plan will address the following:
173.1. Deleted.
173.2. Gross pollutant traps shall be installed inline on the piped systems for all paved
areas that do not fall to the proposed bio-retention devices prior to the run off
entering OS7;
173.3. All primary treatment of runoff will be outside the open space area OS7 to ensure
compliance with MP2;
173.4. Deleted.
173.5. The bio-retention areas within the car parks must be large enough to allow the
proposed planting to thrive and have a viable root system;
173.6. The detailed design of the stormwater management system shall provide for water
reuse within the site so as to ensure that the hydrology of the open space areas is
maintained while using a reasonable quantity of excess water generated by the
development within the site for non-potable purposes such as landscape watering
generally in accordance with the Concept Stormwater Management Plan to the
reasonable satisfaction of the Manager - Land Development. More detailed analysis
using MUSIC or equivalent suitable software is required to refine the water reuse
assessments as well as pollution management measures, with a one hour
(maximum) time step to be used;
173.7. Deleted.
173.8. The Site Rehabilitation Plan shall provide details about the revegetation of water
quality control devices located in the OS7 area and the Landscape Plan shall
provide details about the vegetation of water quality control devices in the developed
precincts. The Stormwater Management Plan shall demonstrate that the proposed
vegetation on the water quality control devices will adequately treat the stormwater
and achieve the required water quality.
173.9. Deleted.
173.10. Deleted.
173.11. Deleted.
173.12. Operational works stormwater management planning is to be included;
173.13. Deleted.
173.14. Deleted.
173.15. Details of the sediment and erosion control for construction management for the
development that adequately addresses the extent of site disturbance proposed;
Page 25 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.