157. The car parking area shall be drained and the pavement (pervious and impervious)
constructed to access road standards to the reasonable satisfaction of the Manager - Land
Development. Plans and specifications for these works shall be submitted with and
application for a development permit for operational works.
158. All car parking shall be kept maintained and line-marked in a condition fit for use.
159. Disabled parking spaces shall be provided for each development component in accordance
with the requirements of AS2890.1, in respect of the number, design and location of these
spaces.
160. The design of the car parking areas will comply with the Australian Standards AS 2890.1 and
AS 2890.2.
Loading Areas
161. Deleted.
162. Deleted.
163. All infrastructure shall be kept clear of the OS3 area including the service roadway (with the
exception of the 5 metre area at the western end of building D of the Showroom Component)
and the garbage collection area. Should part of the existing road reserve adjoining the subject
site to the north be included into the site following the dedication of the land for proposed
Walter Hay Drive, it is accepted that this area of land can contribute towards the OS3 buffer
area to satisfy the requirement for the provision of OS3 under this development permit.
164. Deleted.
External Works Other Than Roads
165. Any necessary stormwater drainage systems required by the any external roadworks fronting
the proposed development as required by these conditions of approval, will need to be
constructed by the applicant as part of those works to the reasonable satisfaction of the
Manager Land Development.
166. Any necessary augmentation or installation of services will also need to be undertaken by
the applicant as part of this development to the reasonable requirements of the Council. The
services will need to be able to cater for the ultimate development of the SBC.
Pedestrian/Cycle Access
167. The applicant shall undertake all work indicated on Pedestrian and Cycle Management Plan
submitted as Annexure 6 as part of the representations to the decision notice issued 1 May
2003. The applicant shall construct all cycleways and pathways as shown on the Pedestrian
and Cycle Management Plan. To this end, the applicant is required to construct a shared
pedestrian and cycleway pathway in lieu of the pedestrian pathways indicated in black on
the Pedestrian and Cycle Management Plan.
168. The applicant will design and construct all works required by the approved Pedestrian and
Cycle Management Plan for the SBC, subject to any modifications required by these
conditions of approval.
169. The applicant will construct access from the SBC pedestrian and cycleway links to the
existing pedestrian/cycleway under Eenie Creek Road, which meets disabled access
requirements and has good sight lines into the pedestrian/cycleway tunnel under Eenie
Creek Road generally in accordance with option 2 on plan 4024 S26B by MPN Consulting
Pty Ltd.
170. The applicant will design and construct access from the pedestrian and cycleways shown on
the Pedestrian and Cycleway Management Plan to the proposed pedestrian/cycleway under
Walter Hay Drive, which has good sight lines into the structure. The applicant will be required
to contribute 50% towards the cost of the pedestrian/cycle underpass proposed under Walter
Hay Drive.
Page 24 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.