Minor Change Existing Approval 132002.220285.I (As Published)
Erosion & Sediment Control
195. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with an
application for a development permit for operational works (earthworks). Site control
measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, may be necessary. Prior to commencement of building works, all physical site control
measures shall be installed, and the plan adhered to.
Town Water Supply
196. The applicant will construct at its cost a second feed in conjunction with the construction of
the Walter Hay Drive access if the anticipated loading on the system for the ultimate
development exceeds the equivalent of 35 tenements.
197. Sizes of the mains are to be a minimum of 150mm diameter and are to be confirmed by a
network analysis carried out by Councils consultants at the applicants cost.
198. A water supply master plan for ultimate development shall be to the satisfaction of the
Manager - Land Development and shall be submitted in conjunction with an application for
operational works (water supply). The Water Supply Master Plan will consider metering of
individual occupancies and common (body corporate) flows as well as the reticulation system
and valving arrangements. All water infrastructure will be designed and constructed in
accordance with the approved Water Supply Master Plan.
Sewer Capacity
199. The applicant at its costs will construct the proposed sewer rising main in the development
to discharge to Manhole NV40/01/18 in Eenie Creek Road.
200. The existing sewer pump station and rising main are to be upgraded by the applicant to the
standards and requirements as detailed in Councils Engineering Design Manual - Water &
Sewerage.
201. A Sewer Master Plan for ultimate development shall be submitted to the reasonable
satisfaction of the Manager Land Development in conjunction with an application for a
development permit for operational works (sewer works).. All sewer infrastructure will be
designed and constructed in accordance with the approved Sewer Master Plan.
202. All internal reticulation works (both water and sewerage) are to be constructed in accordance
with Noosa Council Engineering Standards for Water and Sewerage (depending on tenure
may be classified as private main when completed) and checked by Council with full as
constructed requirements as per Council standards.
Service Easements
203. All infrastructure shall be covered by easements where necessary to the reasonable
satisfaction of the Manager Land Development.
204. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement of Council’s or any other public utility’s
underground infrastructure must have its foundations designed so that no surcharge loads
are imposed upon such underground infrastructure. Foundations must be taken down a
minimum of 1m below a line of influence measured 1m in the direction of the foundation from
the centreline of the closest underground service and along the natural angle of repose of
the foundation soil type(s).
Page 29 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.