Minor Change Existing Approval 132002.220285.I (As Published)
Headworks
205. Headworks contributions are required for Water Supply and Sewerage and will be charged
in accordance with Council’s Planning Policies, PSP 28 - Water Supply Headworks
Contributions and PSP30 - Sewerage Headworks Contributions. These headworks are to be
paid by the applicant prior to the issue of a Development Permit for Building Works. An
estimate only of the expected contribution is:-
Retail Centre $466,608.00
Showroom & Commercial/Business $260,340.00
TOTAL $726,948.00
General
206. Prior to undertaking any excavation, the person acting on this permit shall contact public
utility service providers to ascertain the location of their underground services.
207. The applicant shall sign a written undertaking to be responsible for the full cost of repairs to
road pavement, footpath, kerb and gutter, or other Council property and facilities damaged
as a result of construction of the proposed development.
208. Where kerb and channel is constructed at a road intersection or any other place it is provided,
disabled access shall be incorporated.
209. No Council property or facility shall be interfered with during works associated with this
development without Council approval.
210. A Traffic Management Plan is to be prepared by a Registered Professional Engineer of
Queensland addressing safety during construction, including pedestrian safety, in
accordance with the Manual of Uniform Traffic Control Devices and Department of Transport
(Main Roads Division) Roadworks Signing Guide. A copy of which is to be submitted to
Council for their records prior to construction commencing.
211. All designs for engineering works involving the construction of pavements, kerb and channel,
vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
reticulation shall be prepared in accordance with the requirements of Council's Engineering
Design Standards, shall reference where applicable to Council’s Standard Drawings and
shall incorporate best engineering practice.
212. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction with an
application for a development permit for operational works.
213. Any alteration of a public utility or other facility necessitated by the development of the land
or associated construction works either internal or external to the site
214. Prior to commencement of the use, or a certificate of classification being issued (whichever
occurs first), a certificate shall be submitted to Council from a registered Professional Civil
Engineer of Queensland certifying that the operational works have been inspected and no
items have been identified that suggest the work has not been completed in a workmanlike
manner.
215. As Constructed drawings certified by a registered surveyor and a registered Professional
Civil Engineer of Queensland showing the extent and finished levels of the filling works are
to be submitted for Council's records, prior to the use commencing.
These drawings must fully detail levels for all engineering works including water supply and
sewer reticulation, drainage structures, building floor levels, finished ground levels effluent
trenches and pavement surface levels. Drawings shall be on transparencies, a hard copy
highlighting any changes from design and in electronic format on an IBM PC compatible
floppy disk in a format capable of integration with Council’s computer system.
Page 30 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025