Original source · versioned page text
Minor Change Existing Approval 132002.220285.I (As Published)
230. The eastern area of the Retail Centre (Area 3) shown on the approved plans comprising
155m² is to include 2 trees in pots located on the proposed dining area.
231. A total of 15 carparks and 7 motorcycle spaces are to be provided for the development in
addition to the carparks and motorbike spaces required by the Negotiated Decision Notice
dated 14 August 2003
232. Pedestrian access to all shop entrances shall be kept clear at all times.
233. Any paved or deck areas are not to be enclosed with shutters, glass panelling, fixed roofs or
the like, thus remaining as open areas.
234. All outdoor dining areas shall not include roll-up or drop plastic sheeting.
235. Any shade covers proposed shall be removable or retractable such as umbrellas and roll-
back awnings and be constructed from lightweight materials of natural muted earth tones to
compliment the approved building to the reasonable satisfaction of the Manager Land Use.
Fixed non-retractable shade covers shall not be utilised.
236. Landscaping shall be constructed as indicated on the approved concept plans. Appropriate
species and pot sizes must be approved by the Manager Land Use prior to the
commencement of landscaping construction. The species selected shall be in accordance
with the requirements of the approved Landscape Management Plan.
237. The following additional contributions shall be paid to Council in accordance with Planning
Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and
Sewerage Headworks Contributions respectively and at the rates applicable at the time of
payment. An estimate only of the contribution rates under the current policies is outlined
below. These amounts will adjusted in line with changes to the Consumer Price Index, All
Groups Brisbane from December 2005 until the date of payment.
Water Supply $1,914
Sewerage $1,046
TOTAL $2,960
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Car Wash Facility
238. Waste water and stormwater management shall be in accordance with the Hydraulic
Services Plan and Stormwater Management Plans dated 27 February 2018
239. Contaminants or contaminated water must not be directly or indirectly released from the
premises or to the ground or groundwater at the premises except for:
i. Uncontaminated Overland Stormwater flow;
ii. Uncontaminated Stormwater to the stormwater system;
iii. contaminants released to sewer under and in accordance with a trade waste
permit
240. Releases to water must not cause any visible oil slick or other visible evidence of oil or
grease, nor contain visible, grease, scum, litter or floating oil.
241. The Holder must ensure that:
Page 32 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.