Minor Change Existing Approval 132002.220285.I (As Published)
i. maintenance and cleaning of equipment (including vehicles and plant) is carried
out in an area where contaminants cannot be released into stormwater drainage,
a roadside gutter, a water or onto unsealed ground;
ii. any spillage of contaminants is cleaned up immediately by a method other than
hosing, sweeping or otherwise releasing the contaminants into stormwater
drainage, a roadside gutter or a water.
iii. incident rainfall and overland flow of stormwater does not contact contaminants
242. Any proposed signs, fences, landscaping and barriers (permanent or temporary), particularly
along the northern end of the car wash facility and excluding the approved structures, must
not obstruct sight distances or compromise the widths of existing traffic lanes and parking
aisles.
243. Appropriate line marking must be provided in accordance with the consulting engineer’s
recommendations to demarcate the proposed car wash area/s and the allocated reserved
parking spaces.
244. The works must be constructed in accordance with a Construction Management Plan
prepared by a suitably qualified person and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. iA Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe and unobstructed traffic environment near the construction
site.
iii. Maintenance of safe pedestrian access across the frontage of the construction
site both during daily construction and after daily construction has ceased.
iv. Proposed fencing to the site during the construction phase of the development.
v. Adequate parking arrangements for construction workers to minimise impact on
the customers and users of the parking areas.
vi. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures
vii. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues.
Shade Structure Landscaping
245. The landscape beds either side of the two (2) main car park entrance ways at the north end
of the main car park must be planted with mature trees to form an entrance feature and
provide softening to the shade structures and car park. In this regard, a total of twelve (12)
trees must be planted within a mixed planting arrangement and sustained for the long term
by the means of suitable soil preparation and maintenance scheduling. The trees must
comprise:
245.1. Six (6) x Elaeocarpus eumundi (100 litre pot size)
245.2. Six (6) x Lophostemon confertus (100 litre pot size)
246 Any pruning of existing trees to be retained must not exceed 20% of the canopy OR (must
be carried out in accordance with AS 4373-2007 Pruning of amenity trees.
Supervision/Certification
247 Prior to commencement of use of the shade structures the following (prepared by respective
qualified persons* and certifying compliance with approvals) must be submitted to Council:
Page 33 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.