21. The design and construction of the adjacent roads, drainage, buildings and other works shall
not adversely impact upon the existing native vegetation in OS3 with the exception of entry
statements in accordance with MP2 and approximately the 5 metre strip of service roadway
in the vicinity of Showroom Building D.
22. The species of street trees to be planted on the edge of, or adjacent to, OS3 shall be selected
from the major tree species growing in OS3. Alternatively, they shall be in accordance with
the landscaping requirements contained within this approval.
23. Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken
in OS3 to:
23.1. restart stalled regenerative processes and facilitate ecological sustainability, and
23.2. facilitate the required visual screening.
24. An ecologist in consultation with Council shall determine the need for, and the nature of the
reinforcement plantings and/or understorey thinning. This consultation is to occur prior to the
submission of the Site Rehabilitation Plan for the development in accordance with condition
81.
25. Prior to the use commencing, OS3 shall be protected by a registered environmental
covenant, which shall ensure that the existing native vegetation is maintained to the
satisfaction of Council. The costs associated with the preparation and registration of the
covenant shall be borne by the applicant.
Open Space Area (OS5) - Preservation of Visual Amenity
26. OS5 shall have a minimum width of 12m and a minimum length of 130m generally in
accordance with the approved plans. Apart from providing for the temporary access roadway,
the existing vegetation within this precinct is to be retained and shall not be disturbed to
accommodate carparks, detention ponds, firebreaks or any other infrastructure. Following
the construction of the internal loop road that provides access to this part of the site the
temporary service road is to be removed and the area reinstated in accordance with the Site
Rehabilitation Plan.
27. Deleted.
28. The design and construction of the adjacent roads, drainage, buildings and other works shall
not adversely impact upon the existing vegetation in OS5 other than the temporary service
road and the impact on the existing hydrological regime on which the vegetation depends
shall be minimised.
29. Prior to construction of the adjacent internal loop road, any clearing along the western
property boundary for the purposes of a firebreak shall exclude the vegetation/forest within
OS5.
30. The species of street trees to be planted on the edge of, or adjacent to, OS5 shall be selected
from the major tree species growing in OS5. Alternatively, plantings shall be in accordance
with the landscaping requirements contained within this approval.
31. Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken
in OS5 to:
31.1. restart stalled regenerative processes and facilitate ecological sustainability, and
31.2. facilitate the required visual screening.
32. An ecologist in consultation with Council shall determine the need for, and the nature of the
reinforcement plantings and/or understorey thinning to be undertaken within OS5. This
consultation is to occur prior to the submission of the Site Rehabilitation Plan for the
development in accordance with Condition 81.
Page 9 of 40
Document Set ID: 24254301
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.