Original source · versioned page text
Att9 - Waste Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.2 Collection Access
The Service Provider’s waste collection vehicle is required to enter the property via the internal road network
to access and collect the waste from the bulk bins. Onsite staff are responsible for ensuring that waste
generated by the facility, staff and patrons is appropriately separated and placed in the correct receptacles.
Project number 20220146 File 20220146-59 Kabi RD WMP R0.docx, 2022-09-06 Revision 1 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.