3.1 Waste Stream Summary
The following waste streams are being catered for:
Garbage Domestic and commercial waste
Commingled Recycling Recyclable items include paper, cardboard, PET, glass, aluminium, steel, and
HDPE containers.
Compostable Organic waste suitable for use in composting and permaculture activities.
Other Waste Streams The disposal of other waste including hard waste, waste metal storage,
bailing of paper/cardboard, paints and chemicals shall be the responsibility of
each dwelling. Waste can be disposed and/or recycled at Council Transfer
and Recycling Station.
3.2 Waste Management
3.2.1 Villages No.1 to 3
◼ Each Village manage their own garbage and commingled recycling, and other waste streams as required.
◼ Onsite staff are responsible for ensuring that these streams are deposited into the appropriate bulk waste
and recyclable bins located at each Village.
◼ Collection of waste streams stored in the bulk bins is undertaken by the Service Provider accessing the
site via the internal road network.
◼ The bin storage location is identified in Figure 2. These areas will be accessed by staff and patrons on
foot.
3.2.2 Onsite Staff
◼ Onsite staff manage their own garbage, commingled recycling, and other waste streams as required.
Staff also assist with the management of waste streams within the Villages, amenities, maintenance
sheds, and the reception and central hall, generated by the patrons.
◼ The property’s individual bin locations are identified in Figure 2. The area will be accessed by staff on foot.
3.2.3 Waste Collection Service Provider
◼ Collection of waste streams stored in the bulk bins is undertaken by the Service Provider accessing the
site via the internal road network.
Project number 20220146 File 20220146-59 Kabi RD WMP R0.docx, 2022-09-06 Revision 1 6