Original source · versioned page text
MCU10/2083 Development Application part 2 - Attachment 8 - Civil Infrastructure Report
4.0 STORMWATER AND WATER QUALITY MANAGEMENT 4.1 STORMWATER MANAGEMENT Stormwater drainage design will be carried out in accordance with Council guidelines and the Queensland Urban Drainage Design Manual (QUDM). The development will drain into the existing stormwater systems located within Gibson Road and Skipper Place. Refer to JF&P Consulting Engineers Site Based Stormwater Management, lodged under separate cover for further details on stormwater management for the site. 4.2 WATER QUALITY MANAGEMENT Water quality management will be carried out in accordance with industry best practice procedures and healthy waterways guidelines. Water quality (sedimentation and erosion control) during the construction phase will be managed through the implementation of measures detailed in the civil operational works design drawings to be lodged at the Building Application phase. Refer to JF&P Consulting Engineers Site Based Stormwater Management, lodged under separate cover for further details on water quality management for the site. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.