Original source · versioned page text
MCU10/2083 Development Application part 2 - Attachment 8 - Civil Infrastructure Report
6.0 ENVIRONMENTAL MANAGEMENT 6.1 CONSTRUCTION MANAGEMENT Works carried out during the construction phase of the development will be undertaken in accordance with Council’s conditions of approval and best practice construction management practice. 6.2 SITE BASED MANAGEMENT Works undertaken by the civil contractor during the construction phase of the development will be in accordance with Council’s conditions of approval and best practice construction management practice. Erosion and transportation of sediments off‐site will be controlled by the use of sediment barriers. Stockpiles will be located within the site and contained within individual sediment barriers. Stormwater catchpits will be provided with protection devices where applicable and diversion drains or bunds will be provided to divert clean run‐off around disturbed areas. All sedimentation and erosion control measures will be carried out in accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control – Guidelines for Queensland Construction Sites. 6.3 AIR QUALITY Works undertaken by the civil contractor during the construction phase of the development will be in accordance with relevant environmental policies incorporating air quality criteria. 6.4 NOISE Works undertaken by the civil contractor during the construction phase of the development will be in accordance with relevant environmental policies incorporating generated noise criteria. CIVIL INFRASTRUCTURE REPORT – Revision A 37 Gibson Road, Noosaville Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.