MCU10/2083 Information Request Response 37 Gibson Rd Noosaville
Very large file: it may take a few minutes
The original of this document is very large (15.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
SUNSHINE COAST
URBANC 0 N S U L T ANTS
Monday, 20 December 2010
M 2383-001
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre Q 4560
Att: Mr Denis Wallace
Re: MCU10/2083
Marquette Bowen Pty Ltd
37 Gibson Street, Noosaville
Dear Denis,
Reference is made to the Material Change of Use application noted above.
We acknowledge receipt of Council's correspondence dated 8 December 2010 and provide additional information
requested for Items 14 & 15 as follows:
14. The Site Based Stormwater Management Plan has been amended to ensure that the order of water
treatments is consistent i.e. roofwater to raingardens first, then pass to rainwater tanks. Refer to Revision E of
the plan attached to this response for details.
As the roofwater system operates under approximately 3m of head (effectively operating as a pressure
system) the raingardens can be elevated above finished ground level (if required). The flexibility of being able
to elevate the raingardens (if required) will ensure adequate grade for drainage to the underground rainwater
tanks. The location of the raingardens has also been rationalised to assist with draining to the underground
rainwater tanks.
The central car park area will have a finished surface pavement level of approximately RL 2.40 AHD (subject to
detail design). The bio-retention systems have an invert level 1.00m below the pavement level. The existing
Council stormwater system in Gibson Road has an upstream invert level of RL 0.48 AHD and approximately RL
0.00 AHD in Skipper Place. The level difference of between 0.90m to 1.40m is sufficient to ensure adequate
grade for drainage of the proposed bio-retention devices.
A drainage plan detailing proposed invert levels of pipes required to ensure adequate grade for drainage from
stormwater treatment devices will be prepared and forwarded to Council as part the civil operational works
application.
15. The five shade trees proposed within the central bio-retention basin trench have now been excluded from the
bio-retention system and provided with a suitable footprint for root establishment - refer to JFP Sketch
Drawing M2383 SW.1 Revision F for details.
I/ A V. DESIGNERS
ORS
...-ERS
-
z'j ^,LAPEARCHITECTS
IFP House
76 Frneq Street, South Fkisbane
Pit Box 3634, South Brisbane QW 4101
POI 3a t.t 7161 F 31116 1959
73 7.733 Bradman Avenue, IAaroorhydore
PO Rnx 6 M.roochyd-p QId 45SR
P0754432500 F0754434759
59 Goondooo Street, Gladstone
PO Box 172. Gladstone Qld 4680
P0749772100 F0749775444
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.