5.4 STORMWATER QUALITY TREATMENT TRAIN
A WSUD treatment train has been developed to meet the reduction criteria established in Table 10. Bio-Retention
areas with a total surface / treatment area of 120m2 will be utilised to capture and treat overland flows from
pervious and impervious areas. Healthy Waterways 'WSUD Technical Guidelines', states that to achieve adequate
load reduction targets, bio-retention systems are to be sized at approximately 1-2% of the catchment area. Table
11 provides a catchment breakdown for the total Bio-Retention area.
Table 11 - Bio-Retention System Details
Bio-retention Area Percentage of Catchment
Catchment Area (ha)
(m) Area (%)
0.386 _ 120 3.11
The bio-retention filter media should be planted with a selection of the vegetated types as outlined in Table 12.
Table 12 - Suitable Bio-Retention Vegetation Types
Planting
Height
Scientific Name Common Name Form Density
( mm )
(Qty/r2)
Myoporum parvifolium Creeping Boobialla Prostrate 150 4-6
Cymbopogon refractus Barbed Wire Grass Tufted 300 8-10
Dianella caerulea cv 'Little Jess' Blue Flax-lily Tufted 400 4-6
Dichelachne crinita Long Haired Plume Grass Tufted 200 6-8
Erograstis elongata cv 'Elvera' Elvera Tufted 300 6-8
Imperata cylindrica Blady Grass Tufted 500 4-6
Lepidosperma laterale Variable Sword Sedge Tufted 750 8-10
Lomandra confertifolia subsp Matting Lomandra Tufted 300 4-6
confertifolia
Lomandra confertifolia subsp Mat Rush Tufted 400 4-6
pallida
Poa labillardiere cv 'Eskdale' Eskdale Tufted 450 6-8
Themeda australis Kangaroo Grass Tufted 400 6-8
Themeda australis cv'Mingo' Mingo Tufted 200 8-10
The plants selected must be able to tolerate periods of inundation and a saturated filter material. Therefore
plants with extensive fibrous root systems are required. Refer to Australian Runoff Quality and BCC WSUD
Engineering Guidelines Table 12.1 for additional information and suitable plant varieties.
5.5 MAINTENANCE
A bio-retention basin maintenance plan will be provided at the Operational Works Stage.
SITE BASED STORMWATER MANAGEMENT PLAN - Revision E Cason Road, Noosa,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.