5.1 INTRODUCTION
In recent years there have been an increasing number of initiatives to manage the urban water cycle in a more
sustainable way. The integration of the urban water cycle within the concept of Ecologically Sustainable
Development (ESD) is termed Water Sensitive Urban Design (WSUD). A WSUD treatment train consisting of three
separate bio-retention systems / rain gardens has been proposed to treat all stormwater flows from the
operational phase of the development.
5.2 POLLUTANTS
Pollutants typically generated by during the operational phase of the development are shown below (Gold Coast
City Council, 2005).
Table 9 - Operational Phase Pollutant Sources
Pollutant Potential Source
Construction packaging, construction
Litter
waste materials, paper, food packaging
Sediment Exposed soils and stockpiles
Oxygen demanding substances
Organic or chemical matter
(organic & chemical matter)
Nutrients Nitrogen, phosphorus
Pathogens / Faecal coliforms
Sewage
(bacteria & viruses)
Heavy metals (often associated
Sediment runoff
with fine sediment)
Surfactants (eg. detergents from
Detergents, cleansing agents
car washing)
5.3 OBJECTIVES
Table 10 outlines the stormwater pollutant reductions required for the subject site as stipulated within the
Healthy Waterways 'Water Sensitive Urban Design Technical Design Guidelines for South East Queensland -
Version 1'. The objectives detailed in Table 10 also comply with the outcomes of the Water Sensitive Design Code
of the Sunshine Coast Regional Council (Noosa Plan).
Table 10 - Operational Phase Water Quality Objectives
Pollutant Pollutant Reduction
Suspended Solids 80%
Total Phosphorus 60%
Total Nitrogen 45%
III SITE BASED STORMWATER MANAGEMENT PLAN - Revision E Road, Noo 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.