Skip to the record
The only place to find full transcripts.

Original source · versioned page text

MCU10/2083 Information Request Response 37 Gibson Rd Noosaville

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                    [WMIN
                                                                                                    URBAN




5.8   MUSIC RAINFALL PARAMETERS

Nambour meteorological data was utilised for the MUSIC analysis. Modelling of the site was analysed for a period
of 10 years (1989 - 1998) using a 6 minute time-step period. Average potential evapo-transpiration data has been
taken from the MUSIC software package.



5.9   MUSIC TREATMENT NODE PARAMETERS

Rainwater Tanks:


Rainwater tanks with a total capacity of 20kL are to be installed within the development site. Water from the
rainwater tanks will be utilised for outdoor irrigation and wash down re-use and potentially toilet flush.

Bio-Retention System / Rain Gardens:


Details of the proposed bio-retention systems are shown in Table 16. Appendix A provides a typical detail for a
bio-retention system.

                                  Table 16 - MUSIC Bio-Retention System Parameters

                        Parameter                      Raingardens           Carpark System 1   Carpark System 2

             Extended Detention Depth (m)                  0.25                    0.25               0.25

                     Surface Area (m)                       50                      30                 40

       Saturated Hydraulic Conductivity (mm/hr)            180                     180                180

                      Filter Area (m)                       50                      30                 40

                      Filter Depth (m)                     0.5                     0.5                0.5

         Filter Median Particle Diameter (mm)                5                      5                  5




 SITE BASED STORM WATER MANAGEMENT PLAN - Revision E    Gibson Road, Noes.                                         13
Log in to download the original file

MCU10_2083 Information Request Response 37 Gibson Rd Noosaville.pdf · 15.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.