Original source · versioned page text
MCU10/2083 Information Request Response 37 Gibson Rd Noosaville
Very large file: it may take a few minutes
The original of this document is very large (15.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
WWRA
URBAN
The SBSMP developed by JFP provides significant reductions in post development stormwater runoff pollutant
concentrations entering the street drainage network downstream within Gibson Road and Skipper Place.
To achieve these improvements stormwater flows from roof and car park pavement areas have been directed to
rainwater tank and bio-retention systems rather than a standard pit and pipe arrangement. MUSIC modelling
indicates pollutant reductions in the order of 45-93% of average annual loads which are in line with the objectives
specified in Healthy Waterways `Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland - Version 1' and the Water Sensitive Design Code component of the Sunshine Coast Regional Council
(Noosa Plan).
A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
required to ensure no net increase in post development discharge to the street drainage network within Gibson
Road and Skipper Place.
SITE BASED STORM WATER MANAGEMENT PLAN - Revision E Gibson Road, Noon 1s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.