Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~
i t V b ~" ,I)’\$ q ~ t ,j n
9
innov<1’ti.on ingenuity inspiration
ABN 89106 675156
J. . 3., ’.
I
LIST OF FIGURES
Figure 1: Locality Plan, (2013,Copyright Google Maps) Not to scale, generally indicative only.
-
...........................
6
Figure 2: Aerial Photo, (2013,Copyright Google Earth) -
Not to scale, generally indicative only............................. 6
Figure 3: Volume vs Elevation for Basin 1 ..................................................................................................................8
Figure 4: Volume vs Elevation for Basin 2 .......................................................................
...........................................
9
LIST OF TABLES
Table 1: Catchment and Flow ......................................................................................................................................
7
Table 2: Detention Basin 1 Flow M itigation Table...................................................................................................... 10
Table 3: Detention Basin 2 Flow Mitigation Table ............................................................
..........................................
10
Table 4: Stormwater Quality Objectives for the Site. (Operational Stage) .................................................................
12
Table 5: MUSIC Model Parameter Summary.............................................................................................................13
Table 6: Annual Pollutant Loads ................................................................................................................................
13
Table 7: MUSIC Output Results.................................................................................................................................15
Table 8: Drawings prepared by i3 consulting pty Itd ........................................................
............................................
19
Table 9: Discharge Calculation Table ........................................................................................................................ 20
Page 14
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.