Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
;ci.l l<d ’C>IHldt’ing
~l
innova.tion ingenuity Inspiration
ABN 89 106 675156 ~
1. Introduction
1.1 Background
i3 consulting was commissioned by Multispan Australia to undertake the stormwater quantity and quality
documentation required for the development approval application for the proposed development at Lot 94 Rufous
Street, Peregian Beach. This report covers the stormwater quantity and quality for the development approval. The
proposed development is shown on drawing 13-024-C31 in Appendix A.
1.2 Objectives
This report has been compiled to address the stormwater quality and quantity requirements of the Water Sensitive
Urban Design Guidelines for South East Queensland, the Environmental Protection Act 1994 and the Environmental
Protection (Water)Policy 1997.
1.3 Scope
The scope of this report encompasses in detail the post construction phase of development; however the
construction phase is briefly addressed.
PagelS
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.