Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
iUlbe(! (1)1)5u10n9
innovation ingenuity inspiration
~
ASN 89106 675156 ~
3. Site Hydrology
3.1 Method and Approach
The stormwater discharges from this site were calculated using the rational method. This method as described in the
Queensland Urban Drainage Manual (QUDM)is commonly used in municipal hydrology and is more than adequate
for the design requirements. The Rational Method is based around the Rational formula:
Q=-
C/lyA
y
360
Where: Qy = Peak flow rate (m3/s)for the average recurrence interval (ARI)of y years
Cy = Coefficient of runoff for ARI of y years
A = Area of catchment (ha)
t
I =
Average rainfall intensity (mmlhr)for design duration of t hours and
y
an ARI of y years.
When designing the stormwater drainage system the following points have been considered:
Storm water treatment shall be designed for a 3 month storm event, calculated as Q1 x 0.5; and Stormwater
reticulation is to cater for Q3 month, Q20 and Q100 storm events.
For the purposes of this stormwater quality assessment, the area of the proposed development requiring stormwater
quality treatment has been divided up into 1 catchment:
Table 1 details catchment names, areas and storm event flows for the catchment based on the Rational Formula.
Refer to Appendix B for details of catchment calculations and Appendix A, drawing 13-024-C34, for catchment areas.
Table 1: Catchment and Flow
Catchment Catchment Area Ql00 Major Flow Q20 Minor Flow Q3 month Treatable Flow
Catchment E 0.1743 ha 0.153 m3/s 0.111 m3/s 0.021 m3/s
Page 17
Level 2, 39 Sherwood Road [email protected] P: 07 3870 8888
Toowong QLD 4066 www.icubed.com.au F: 07 3870 8988
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.