                                                                                              2010/811



Roof Water & Stormwater Drainage
29.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that is
      installed within the property to ensure water from the rainwater storage system or tank is used
      for external uses (such as watering gardens, irrigation, ornamental ponds, water features,
      topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing
      machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in
      accordance with the Queensland Development Code (QDC) current at the time of building
      approval, and shall be part of the plumbing application for approval. The location and capacity
      of the tanks shall be clearly shown on the plans submitted for Building Works and Operational
      Works approvals and any overflow shall be discharged into the existing stormwater system
      (stormwater structure or kerb & channel) at Tristania Drive.
30.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall
      be collected and discharged so there is no net increase in stormwater runoff from the site.
      Stormwater drainage permitted to drain from the site shall be discharged to Council’s: existing
      drainage system (kerb & channel or/and stormwater structures) in Tristania Drive generally as
      shown on drawing No 10031 -2 A dated 20 May 2010 by Ian Bradford. Detailed plans of the
      drainage design for operational works shall be prepared by a suitably qualified and experienced
      person and submitted to Council prior to obtaining a Development Permit for Operational
      Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
31.   The development shall not cause diversion of stormwater or adversely impact on the existing
      drainage conditions on adjoining properties or the road reserve.
32.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
      provided on site prior to being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through
      a single underground drain line directly into the existing drainage system, bypassing the
      grease/oil arrestor/gross pollutant trap.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme
      for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
33.   All site stormwater drainage shall be by means of a gravity system.
Earthworks
34.   All earthworks (filling or excavation) required on site shall be carried out in accordance with
      Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. Filling on the site
      shall not cause any additional ponding of water on any adjoining lands or the blockage of, or
      interference with, any natural watercourses.
35.   Any imported fill to the site may only be from a site licensed with The Environmental Protection
      Agency or from a site for which a Development Permit for Operational Works has been issued
      approving the export of fill.
36.   Earthworks carried out on site shall not affect the structural integrity of any of the existing fences
      or structures that border the development site. Fences that are affected shall be replaced prior
      to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be
      replaced shall be clearly shown on the plans submitted for Operational Works approval.

                                                                                              Page 6 of 16

Used in these records

About this file

File size
293 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000811.001 [As Published].pdf · 293 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.