Table 3: XP Storm Existing Peak Flow Results – Site B (South) (m3/sec)
ARI & AEP
Storm Duration
1 Years 2 Years 5 Years 10 Years 20 Years 50 Years 100 Years
(min)
63% 39% 18% 10% 5% 2% 1%
20 0.000 0.001 0.011 0.023 0.034 0.043 0.058
25 0.000 0.003 0.017 0.027 0.039 0.055 0.069
30 0.002 0.005 0.022 0.033 0.045 0.061 0.073
45 0.007 0.012 0.030 0.043 0.055 0.071 0.085
60 0.010 0.015 0.036 0.049 0.064 0.083 0.098
90 0.013 0.018 0.039 0.053 0.070 0.083 0.098
120 0.013 0.018 0.037 0.053 0.069 0.081 0.096
180 0.013 0.018 0.038 0.054 0.070 0.079 0.093
Critical 0.013 0.018 0.039 0.054 0.070 0.083 0.098
Critical Even (Min) 90 90 90 180 90 60 60
Table 4: XP Storm Existing Peak Flow Results – Site B (South) (m3/sec)
ARI & AEP
Storm Duration
1 Years 2 Years 5 Years 10 Years 20 Years 50 Years 100 Years
(min)
63% 39% 18% 10% 5% 2% 1%
20 0.000 0.001 0.016 0.034 0.051 0.064 0.088
25 0.001 0.004 0.025 0.040 0.059 0.084 0.106
30 0.003 0.008 0.034 0.051 0.071 0.098 0.120
45 0.010 0.018 0.048 0.070 0.090 0.117 0.141
60 0.016 0.024 0.059 0.079 0.103 0.134 0.160
90 0.021 0.029 0.064 0.087 0.114 0.136 0.161
120 0.022 0.031 0.061 0.086 0.113 0.131 0.157
180 0.022 0.030 0.062 0.087 0.114 0.132 0.157
Critical 0.022 0.031 0.064 0.087 0.114 0.136 0.161
Critical Even (Min) 120 120 90 90 90 90 90
Discharge hydrographs for the existing model have been included in Appendix E.
4.1.3 XP Storm and Rational Method Comparison
Before utilising data from XP storm, a comparison of results from XP Storm and the Rational Method was undertaken to
ensure that the XP Storm model was functioning correctly. Peak discharge rates from the site in the existing case were
compared (“site” catchments defined in Table 1). The comparison was undertaken for the Site A catchment only outlined
in Table 4. Detailed Rational Method calculations can be reviewed in Appendix D.
www.bornhorstward.com.au Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.