Council archive · source document
Appendix D- Stormwater Management Plan · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
BORNHORST +WARD Table 10: XP Storm Developed Mitigated Peak Flow Results — Site A (m3/sec) Storm Duration ARI (Years) (min) 1 2 5 10 20 50 100 20 0.037 | 0.040 | 0.091 0.161 0.247 0.408 0.515 25 0.040 | 0.046 | 0.132 0.231 0.349 0.514 0.619 30 0.042 | 0.058 | 0.177 0.295 0.422 0.579 0.680 45 0.063 | 0.101 | 0.274 0.425 0.546 0.697 0.881 60 0.084 | 0.128 | 0.326 0.482 0.617 0.798 1.010 90 0.112 | 0.162 | 0.369 0.520 0.668 0.887 1.119 120 0.124 | 0.173 | 0.369 0.517 0.660 0.838 1.081 180 0.128 | 0.179 | 0.366 0.536 0.699 0.896 1.158 Critical 0.128 | 0.179 | 0.369 0.536 0.699 0.896 1.158 Critical Event 180 180 180 180 180 180 180 Table 11: XP Storm Developed Mitigated Peak Flow Results — Site B (North) (m3/sec) Storm Duration ARI (Years) (min) 1 2 5 10 20 50 100 20 0.009 | 0.010 | 0.018 0.028 0.037 0.048 0.056 25 0.010 | 0.011 | 0.022 0.032 0.042 0.052 0.060 30 0.010 | 0.012 | 0.025 0.035 0.044 0.055 0.061 45 0.011 | 0.015 | 0.031 0.041 0.050 0.061 0.068 60 0.013 | 0.017 | 0.035 0.047 0.058 0.068 0.084 90 0.013 | 0.017 | 0.037 0.050 0.061 0.070 0.097 120 0.013 | 0.017 | 0.035 0.048 0.059 0.067 0.088 180 0.012 | 0.016 | 0.036 0.050 0.061 0.067 0.090 Critical 0.013 | 0.017 | 0.037 0.050 0.061 0.070 0.097 Critical Event 60 60 90 90 90 90 90 Table 12: XP Storm Developed Mitigated Peak Flow Results — Site B (North) (m3/sec) Storm Duration ARI (Years) (min) 1 2 5 10 20 50 100 20 0.010 | 0.011 | 0.016 | 0.028 | 0.040 | 0.053 0.063 25 0.010 | 0.011 | 0.021 | 0.036 | 0.048 | 0.061 0.077 30 0.011 | 0.012 | 0.027 | 0.041 0.053 | 0.066 0.096 45 0.012 | 0.015 | 0.038 | 0.052 | 0.063 | 0.097 0.132 60 0.013 | 0.018 | 0.042 | 0.058 | 0.074 | 0.122 0.153 90 0.015 | 0.021 | 0.046 | 0.061 | 0.089 | 0.130 0.161 120 0.016 | 0.022 | 0.045 | 0.060 | 0.086 | 0.128 0.161 180 0.016 | 0.022 | 0.044 | 0.061 0.104 | 0.134 0.161 Critical 0.016 | 0.022 | 0.046 | 0.061 | 0.104 | 0.134 0.161 Critical Event 120 | 120 90 90 180 180 90 Further details of the outputs for the critical events have been located within Appendix D. www.bornhorstward.com.au Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.