4.1.7 Hydraulic Impacts on Downstream Waterway Corridor
A comparison of critical peak flows for the existing and developed mitigated scenarios has been included in Table 10, 11
and 12. The hydraulic modelling undertaken has demonstrated that the proposed development will not cause a worsening
impact downstream of the site in all storm events and that the detention has been adequately sized. Therefore, the
required detention volume for all three catchments across the development in the 1% AEP storm event is 2,670m3.
Discharge hydrographs, stage/water elevations for the detention basin and associated XP Storm outputs have been
included in Appendix E of this report to demonstrate the performance of the proposed detention system.
Table 13: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site A (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.134 0.128 -0.006
2 0.197 0.179 -0.018
5 0.431 0.369 -0.062
10 0.613 0.536 -0.077
20 0.813 0.699 -0.114
50 0.998 0.896 -0.102
100 1.182 1.158 -0.024
Table 14: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site B (North) (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.013 0.013 0.000
2 0.018 0.017 -0.001
5 0.039 0.037 -0.002
10 0.054 0.050 -0.004
20 0.070 0.061 -0.009
50 0.083 0.070 -0.013
100 0.098 0.097 -0.001
Table 15: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site B (South) (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.022 0.016 -0.006
2 0.031 0.022 -0.009
5 0.064 0.046 -0.018
10 0.087 0.061 -0.026
20 0.114 0.104 -0.010
50 0.136 0.134 -0.002
100 0.161 0.161 0.000
www.bornhorstward.com.au Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.