5. STORMWATER QUALITY
5.1 CONSTRUCTION PHASE
As a result of the proposed development, contaminants will be generated during the construction phase. A
comprehensive Erosion and Sediment control plan including the construction process will be prepared during the detailed
design. This is to be kept on site during the construction phase and will be in accordance with the State Planning Policy
2017 and Noosa Shire Planning Scheme.
5.2 OPERATIONAL PHASE
As the proposed development includes building work that involves greater than 2,500m2 of land the State Planning Policy
(2017) and Noosa Shire Council Planning Scheme requirements for water quality are applicable to the proposed
development.
5.2.1 Pollutants of Concern
The key pollutants to be targeted and the minimum reductions in mean annual loads described in Table 9.4.8.3 the State
Planning Policy of Noosa Shire Council outlined in Table 16.
Table 16: Noosa Shire Council Water Quality Objectives
Reduction in Mean
Pollutant
Annual Load
Total Suspended Solids (TSS) 80%
Total Phosphorus (TP) 60%
Total Nitrogen (TN) 45%
Gross Pollutants (GP) 90%
5.2.2 Modelling/Assessment Approach
A quantitative assessment of stormwater runoff quality was considered for the catchments ultimate developed scenario.
The predicted reductions in mean annual loads of key pollutants have been identified using the “Model for Urban
Stormwater Improvement Conceptualisation” (MUSIC), Version 6 (6.3.0). MUSIC is a stormwater quality modelling program
that provides estimates of stormwater pollution generation and the performance of stormwater management measures
used in series or parallel to form a ‘treatment train’.
5.2.3 Meteorological Data
The first step in creating the MUSIC model was to select the appropriate meteorological data set (period and time step) to
be used as the basis for the runoff algorithms. Section 3.1 – Meteorological Data and Section 3.2 – Modelling Period and
time-step, of the MUSIC Modelling Guidelines details the Rainfall Data and Time Step process requirements of the model,
respectively.
The time step used for the MUSIC modelling process was: Tewantin RSL Park 6 Minutes, Station No: 040908.
www.bornhorstward.com.au Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.