Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix D- Stormwater Management Plan · MCU23/0078

of 74

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

5. STORMWATER QUALITY

5.1     CONSTRUCTION PHASE

        As a result of the proposed development, contaminants will be generated during the construction phase. A
        comprehensive Erosion and Sediment control plan including the construction process will be prepared during the detailed
        design. This is to be kept on site during the construction phase and will be in accordance with the State Planning Policy
        2017 and Noosa Shire Planning Scheme.


5.2     OPERATIONAL PHASE

        As the proposed development includes building work that involves greater than 2,500m2 of land the State Planning Policy
        (2017) and Noosa Shire Council Planning Scheme requirements for water quality are applicable to the proposed
        development.


5.2.1   Pollutants of Concern


        The key pollutants to be targeted and the minimum reductions in mean annual loads described in Table 9.4.8.3 the State
        Planning Policy of Noosa Shire Council outlined in Table 16.


                                          Table 16: Noosa Shire Council Water Quality Objectives
                                                                          Reduction in Mean
                                            Pollutant
                                                                             Annual Load
                                            Total Suspended Solids (TSS)          80%

                                            Total Phosphorus (TP)                 60%

                                            Total Nitrogen (TN)                   45%

                                            Gross Pollutants (GP)                 90%


5.2.2   Modelling/Assessment Approach


        A quantitative assessment of stormwater runoff quality was considered for the catchments ultimate developed scenario.


        The predicted reductions in mean annual loads of key pollutants have been identified using the “Model for Urban
        Stormwater Improvement Conceptualisation” (MUSIC), Version 6 (6.3.0). MUSIC is a stormwater quality modelling program
        that provides estimates of stormwater pollution generation and the performance of stormwater management measures
        used in series or parallel to form a ‘treatment train’.


5.2.3   Meteorological Data


        The first step in creating the MUSIC model was to select the appropriate meteorological data set (period and time step) to
        be used as the basis for the runoff algorithms. Section 3.1 – Meteorological Data and Section 3.2 – Modelling Period and
        time-step, of the MUSIC Modelling Guidelines details the Rainfall Data and Time Step process requirements of the model,
        respectively.


        The time step used for the MUSIC modelling process was: Tewantin RSL Park 6 Minutes, Station No: 040908.




                                                       www.bornhorstward.com.au                                           Page 12

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D- Stormwater Management Plan.PDF · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.