Performance Outcomes Acceptable Outcomes
drainage and earthworks provides guidance on requirements for
preparing an Erosion Management Plan.
AO14.2
Construction works are designed and managed to restrict the
extent of clearing and soil exposure to the minimum necessary for
access, and safe construction at any one time.
AO14.3
For buildings:
(a) upstream runoff is diverted around the construction site;
(b) sediment barriers are provided downslope of disturbed
areas to prevent sediment washing into gutters, drains and
waterways , wetlands or drainage lines either on or off the
site; and
(c) temporary or permanent downpipes are connected to the
stormwater system before laying the roof; or
(d) localised erosion is avoided by directing flow from
downpipes over nonerosive areas.
AO14.4
Chemical flocculants used as part of an erosion and sediment
control plan do not harm the environmental values within
receiving waters.
AO14.5
Appropriately sized litter containment areas, with provision for
sorting recyclables are provided for the type of litter expected to be
generated onsite.
Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Wastewater management and effluent disposal
PO15 AO15
Development does not discharge wastewater unless it can be Wastewater (nonsewage) generated from the development is
demonstrated to not compromise environmental values of collected and contained onsite, and is:
waters and water quality objectives. (a) lawfully disposed to sewer; or
(b) transferred offsite for treatment/disposal to an
Editor’s Note—Environmental values of waters and water appropriately licenced facility;
quality objectives are prescribed in Schedule 1 of the reused onsite in a closedcycle irrigation scheme,
(c)
Environmental Protection (Water) Policy 2009. industrial processes, washing or cleaning or other
purpose; or
(d) treated to meet the drinking water supply environmental
values prior to release.
Editor’s Note—The Plumbing and Drainage Act 2003 sets out
requirements for wastewater management.
PO16 AO16
Onsite effluent treatment and disposal systems are designed, An onsite effluent system and disposal area is:
constructed and managed to not compromise the environmental (a) not located on a slope greater than 1 in (10%);
values of waters and water quality objectives.
(b) not located at or below the 1% annual exceedance
probability (AEP flood event);
NOOSA PLAN 2020 AMENDED AT 25 SEPTEMBER 2020 Page 119 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.