Council archive · source document
Appendix D- Stormwater Management Plan · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 71, section 1. The text section number identifies this passage in the reader.
Performance Outcomes Acceptable Outcomes
(c) not located within a riparian buffer area mapped on a
Biodiversity, Waterways and Wetlands Overlay Map; and
(d) setback 400 metres minimum from the full supply level of
Lake Macdonald.
Editor’s Note—The Plumbing and Drainage Act 2003 sets out
requirements for onsite effluent treatment and disposal. The
Queensland Plumbing and Wastewater Code and associated
guidelines are used to confirm the suitability of each site to
accommodate an onsite sewerage facility; or where a centrally
located group collection treatment system is proposed,
confirmation as to the suitability of the designated site to
accommodate the onsite sewerage facility. Additionally, where the
combined total peak design capacity of effluent treatment is less
than 21 equivalent persons, the design of the system achieves a
low to medium risk classification in accordance with Seqwater’s
Land Use Risk Tool for onsite sewerage facilities.
NOOSA PLAN 2020 AMENDED AT 25 SEPTEMBER 2020 Page 120 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.