Figure 2: Noosa Shire Council Interactive Flood Map
3. EXISTING AND PROPOSED STORMWATER INFRASTRUCTURE
3.1 EXISTING INFRASTRUCTURE
A Dial Before You Dig investigation, detailed survey, and examination of as-constructed documentation for the
surrounding roadways has been completed of the site and its surrounding area. The following stormwater infrastructure
was noted:
− An existing 600mm dia. stormwater pipe and temporary inlet is located at the south-west corner of the Site A lot
which conveys flows below Hofmann Drive and into Eenie Creek;
− An existing 375mm dia. stormwater pipe with multiple gully pits is located along the southern half of the internal
access roadway which also conveys flows along Hofmann Drive and into Eenie Creek;
− An existing 750mm dia. stormwater pipe with multiple gully pits is located along the northern half of the internal
access roadway which conveys flows to the north into the upstream end of the environmental zone and natural
drainage channel; and
− The stormwater infrastructure has been built for a fully developed catchment.
As-constructed Drawings of the existing stormwater infrastructure and detailed survey can be found in Appendix C.
www.bornhorstward.com.au Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.