Council archive · source document
Appendix D- Stormwater Management Plan · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
3.2 PROPOSED STORMWATER DRAINAGE
The following points outline the proposed stormwater infrastructure for the development site:
− Minor events from within Site A will be conveyed by an internal stormwater piped network to the existing 600mm
dia. stormwater pipe at the south-west corner of the development site;
− Minor events from within Site B will be conveyed by an internal stormwater piped network to the existing gully
pits along the private access roadway along the western frontage of the development site;
− Major events will be conveyed via overland flow towards and onto the surrounding private access roadways and
environmental zones as per existing conditions;
− Run-off from the remaining un-developed areas of site B will be conveyed via catch drains around the proposed
development works area to the private access roadway as per existing catchment characteristics;
− As there will be an increase to the impervious area as a result of the proposed development, there will be an
increase to peak stormwater discharge rates from the development site. Based on this, stormwater detention
measures are required, and three below-ground stormwater detention tanks are proposed across both Sites A
and B; and
− Considering the development works area is greater than 2500m2, stormwater quality treatment measures are
required for the proposed development as per the State Planning Policy and Noosa Shire Council Planning
Scheme. Treatment is proposed within the below-ground stormwater tanks.
Refer to the engineering drawings in Appendix B for further information.
4. STORMWATER QUANTITY ANALYSIS
Under the Noosa Shire Council Guidelines, several design elements were identified in relation to stormwater management
issues. Noosa Shire Council must be satisfied that:
− The proposed development can be drained;
− The stormwater management system can follow the features and functions of the natural drainage system;
− The volume, timing, velocity and pollutant load of stormwater has no adverse effect on any surrounding
properties or receiving waters; and
− Suitable provision is made in the design layout to accommodate for major drainage.
All stormwater discharge will comply with Noosa Shire Council’s Stormwater Management Code with quantity calculations
completed in accordance with the requirements and methods outlined in the Queensland Urban Drainage Manual
(QUDM).
4.1 DETAILED HYDRAULIC MODELLING – XP STORM
A detailed hydrologic and hydraulic analysis using XP Storm software has been undertaken to model the stormwater flow
characteristics of the site more accurately.
XP Storm is a hydraulic modelling software tool that utilises detailed hydrograph flow analysis to provide an effective
representation of urban stormwater systems. Hydrographs are calculated using the Laurenson Method for runoff routing
in conjunction with the Uniform Loss model for determining catchment losses. XP Storm has been used to demonstrate
www.bornhorstward.com.au Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.