Stormwater Management Plan
                                                                                          ~,.., Cardno@

7                MUSIC Modelling


7.1              Summary
MUSIC Version 5.1.16 was used in the               analysis.     The MUSIC      Modelling Guidelines for South East
Queensland (Healthy Waterways, 2010) were used as the main reference to set up the models.

The rainfall data was taken from Cooroy Composite (40059)for the 10 year period from the 1/1/1973 to
31/12/1982. A 6 minute time step was adopted.

The MUSIC model layouts for each precinct are shown in Appendix E.


7.2              Catchment Areas

The sub-catchment areas are shown in Figure 2.

The rainfall runoff parameters and pollutant export parameters were taken from Tables 3.7 and 3.8 of the
MUSIC Modelling Guidelines.

For the  existing case a rural-residential node was used, with a 0 percent impervious value. For the
developed case an urban-residential nodes were used, except for a small area of commercial development
in Area C. The residential areas were assumed to be 60 percent impervious, townhouses, apartments and
retirement living areas were assumed to be 70 percent impervious.

The breakdown of road, roof and ground area was based on the concept masterplan layout. For precincts
where the layout has not been specified typical surface type splits from Table 3.3 of the manual were used.
The roof       area   of   premium   residential lots was assumed to be 250 m2, and the roof       area   for standard
residential lots was assumed to be 215 m2 in accordance with Table 3.3. All of the available roof area will be
connected to rainwater tanks so as to maximise stormwater harvesting on site.

The new access roads have been included in the MUSIC modelling. The upgrade of existing Council roads
will be undertaken on behalf of Councilor by Council, at a cost to the development. These roads will be

provided with best practice stormwater quality treatment. These road upgrades have not been included in
the MUSIC modelling.

The breakdown of each sub-catchment is shown in Table 7-1.

Table 7-1        MUSIC Sub-catchments

  ~l~                                            ~                              ~                      (ft            I
      ~                    (JlE1]      t::mE     ~1l                   ~        ~lI           llmE        ~0
                                       (Iffi1l   ~                     (JlE1)   ~             [liEt]       ~
                                                 ~                              ~                          ~
      1 _B_1               1.200       0.425         100               0.161        60        0.614           32

      1 _B_2               1.948       0.525         100               0.566        60        0.857           36

      1 _B_3               0.555       0.225         100                                      0.330           33

      1 _B_4               1.280       0.325         100               0.490        60        0.465           32

      1 _B_5               0.895       0.325         100               0.112        60        0.458           32

      1 _B_6               0.139                     100               0.139        60

      1_C_1                1.264       0.442         100               0.379        70        0.442           30

      1 _0_1               3.911       1.369         100               1.173        70        1.369           30

      1 _0_2               0.833                                       0.833        60

      1 _0_3               0.278                                       0.278        60

      1 _E_1               3.174       1.111         100               0.952        70        1.111           30




Northbrook Corporation Pty Ltd                             Version 2                                   29 November 2012

SMP_v2.docx                                       Commercial in Confidence                                     Page 14

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.