   Noosa on Weyba
   Stormwater Management Plan
                                                                                                         ~,.., Cardno@

   8                  MUSIC Model Results


   8.1                Load Reduction

   The resultant load reduction with the proposed treatment train in place is shown in Table 8-1. The results
   show that the load reduction targets are met for all precincts. For the site as a whole the WQOs are easily
   met.

   Table 8-1          Pollutant Load Reductions


 [it1J1!I}J;1l                                                   [;trgjJ’G=WIbmlt!l ~f1" uw::D
                                                                                 ~                                                                I
                      ~                                                         ll’rm                                                   ~
                                                                                                                                           cmJ
                                 ID         C!l     [!)        [3          ~            @          rn     D          [3         [b
    Total             80.0      84.7       82.4    82.4       80.7       80.2       81.3          84.9   80.8       90.2       81.5       82.2
 Suspended
Solids (TSS)

    Total             60.0      64.5       63.0    62.1       63.7       61.1       61.8          67.1   62.4       67.9       63.0       63.2
Phosphorous
    (TP)
Total Nitrogen        45.0      53.0       46.3    52.8       57.5       45.8       45.1          48.2   55.7       45.5       56.5       51.9
    (TN)

    Gross             90.0      100.0      100.0   100.0      100.0      100.0      100.0        100.0   100.0     100.0      100.0       100.0
  Pollutants
    (GP)


   The developed         case   pollutant loads were also compared to the existing case.                   The results are shown in
   Table 8-2. The results show that the developed case pollutant loads are less than or equal to the existing
   case pollutant loads for all pollutants modelled. Therefore the proposed development provides                                          an

   improvement in stormwater quality being discharged from site, based on the pollutants modelled.
   Table 8-2          Comparison to Existing Case

                                                      1ft:1JJiIDC!h
                                                                                 ~{!hE
                                                                                 (  ,mm
          Total Suspended Solids (kg/yr)                   117000.0                     114640.0                 20435.0

                 Total Phosphorus (kg/yr)                    106.0                       228.3                    83.9

                  Total Nitrogen (kg/yr)                     814.0                       1258.5                   605.6

                 Gross Pollutants (kg/yr)                     0.0                       14264.0                    0.0




   It should be noted that only the developed areas of the site were modelled in MUSIC. The remaining areas
   will be designated as parks, buffer areas and conservation zones and rehabilitated and/or revegetated as

   appropriate.        As some of these areas are currently used for cattle grazing it is expected that the resultant
   stormwater quality from these areas will also improve.


   8.2                Sensitivity Analysis
   Several sensitivity analyses were run to determine the potential impact of filter media blockage; the impact of
   having only half the tank volume and the impact of connecting roof area to the bio-retention gardens, rather
   than directly to underground drainage. The results are shown Table 8-3.




   Northbrook Corporation Pty Ltd                                   Version 2                                              29 November 2012

   SMP_v2.docx                                             Commercial in Confidence                                                   Page 20

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.