~,.., Cardno@
8 MUSIC Model Results
8.1 Load Reduction
The resultant load reduction with the proposed treatment train in place is shown in Table 8-1. The results
show that the load reduction targets are met for all precincts. For the site as a whole the WQOs are easily
met.
Table 8-1 Pollutant Load Reductions
[it1J1!I}J;1l [;trgjJ’G=WIbmlt!l ~f1" uw::D
~ I
~ ll’rm ~
cmJ
ID C!l [!) [3 ~ @ rn D [3 [b
Total 80.0 84.7 82.4 82.4 80.7 80.2 81.3 84.9 80.8 90.2 81.5 82.2
Suspended
Solids (TSS)
Total 60.0 64.5 63.0 62.1 63.7 61.1 61.8 67.1 62.4 67.9 63.0 63.2
Phosphorous
(TP)
Total Nitrogen 45.0 53.0 46.3 52.8 57.5 45.8 45.1 48.2 55.7 45.5 56.5 51.9
(TN)
Gross 90.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Pollutants
(GP)
The developed case pollutant loads were also compared to the existing case. The results are shown in
Table 8-2. The results show that the developed case pollutant loads are less than or equal to the existing
case pollutant loads for all pollutants modelled. Therefore the proposed development provides an
improvement in stormwater quality being discharged from site, based on the pollutants modelled.
Table 8-2 Comparison to Existing Case
1ft:1JJiIDC!h
~{!hE
( ,mm
Total Suspended Solids (kg/yr) 117000.0 114640.0 20435.0
Total Phosphorus (kg/yr) 106.0 228.3 83.9
Total Nitrogen (kg/yr) 814.0 1258.5 605.6
Gross Pollutants (kg/yr) 0.0 14264.0 0.0
It should be noted that only the developed areas of the site were modelled in MUSIC. The remaining areas
will be designated as parks, buffer areas and conservation zones and rehabilitated and/or revegetated as
appropriate. As some of these areas are currently used for cattle grazing it is expected that the resultant
stormwater quality from these areas will also improve.
8.2 Sensitivity Analysis
Several sensitivity analyses were run to determine the potential impact of filter media blockage; the impact of
having only half the tank volume and the impact of connecting roof area to the bio-retention gardens, rather
than directly to underground drainage. The results are shown Table 8-3.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.