Stormwater Management Plan
~,.., Cardno@
If the filter media hydraulic conductivity reduces from 200 mm/hr to 50 mm/hr the WQOs are not met.
However, it should be noted that a significant reduction in pollutant loads, close to the WQO targets, is still
achieved and the resultant pollutant load would still be less than the existing case. Proper maintenance of
the filter media will be required to ensure that the hydraulic conductivity does not significantly reduce over
time.
If only half of the tank size is implemented then the WQOs are still met for all pollutants, for the site as a
whole. Therefore if necessary, the QDC minimum size tanks could be adopted on site. It should be noted
that for Areas C, F, G and K the TN WQO is not met. It is therefore recommended that these precincts adopt
the larger tank sizes. The proposed tank sizes supply around 82 percent of the non-potable water demand.
If the tank sizes are halved this reduces to around 66 percent. The larger tank sizes therefore supply an
additional 23 ML/yr of non-potable water. Non-potable water demand is generally estimated to be around 65
percent of the total water demand. Therefore around 53 percent of the total water demand of the site can be
supplied by rainwater tanks. It is therefore recommended that the proposed larger tank sizes be maintained
so that the water demand of the site is minimised. It should be noted that irrigation of park areas outside of
the precinct areas has not been assumed in the MUSIC modelling. The larger tank sizes will potentially also
allow for irrigation of these areas, therefore further reducing the water demand of the site.
The proposed bio-retention gardens will have the rainwater tank overflow directly connected to underground
drainage. This was found to improve the efficiency of the bio-retention gardens as it allows them to better
treat the runoff from the road and ground nodes. A sensitivity analysis was conducted to determine the
impact of having rainwater tank overflow draining to the kerb. The results show that for the site as a whole
that the WQOs are still met. For the effected precincts there was a reduction in the removal of TSS and TP
below the WQO and an improvement in the TN removal. It is therefore recommended that these areas
maintain the direct connection to underground drainage. However, if this is not possible in some areas, the
WQOs for the site as a whole are still met if tank overflow is directed to the kerb.
Table 8-3 Sensitivity Analysis Results
~ ma g~i ru c:wl!mml ~i uNA D
.
I
I
wm!l ~ ~~ mrrn~ ~mID
~ @ll’iIim:IDi1 rID @:rl!l:H"" I
Total Suspended Solids (TSS) 80.0 82.2 77.5 81.7 80.8
Total Phosphorous (TP) 60.0 63.2 59.2 62.1 62.6
Total Nitrogen (TN) 45.0 51.9 42.5 49.9 53.3
Gross Pollutants (GP) 90.0 100.0 100.0 100.0 100.0
The impact of community education, bio-retention tree pits, litter baskets, buffer areas and rehabilitation of
the waterway corridors has not been included in the MUSIC modelling, unless stated otherwise. Therefore
the MUSIC results are a conservative assessment of the improvement in stormwater quality that can be
achieved on site.
8.3 Frequent Flow Objective
The developed area of the site is 56.36 hectares, and is on average 62.5 percent impervious. The first 15
mm of runoff from impervious surfaces is therefore 5.28 ML/day. Based on the 10 years of rainfall data used
in the MUSIC modelling, the average annual runoff from the first 15mm of runoff from impervious surfaces is
equivalent to 317.2 ML/year. The total average annual runoff was 607.8 ML/year.
The MUSIC model was used to determine how much of the runoff was being treated by the bio-retention
basins and swales. The rainwater tanks were removed from the modelling, so that there were no other
outflows. The amount of runoff being treatedby the bio-retention basins and swales alone was 364.7
ML/year. This is greater than the amount of runoff generated from the first 15mm of rainfall from impervious
surfaces, and therefore the frequent flow objectives are met.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.