Skip to the record
Every meeting, every word.

Council archive · source document

Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Noosa on Weyba
Stormwater Management Plan
                                                                                          ~,.., Cardno@

9              Conclusion

Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the

upmost importance. For this reason the best available stormwater treatment measures have been proposed.
The proposed WSUD strategy for the site includes:

>   Community education.
>   Reducing potable water demand through use of water efficient devices and appliances
>   Large rainwater tanks (around twice the QDC size requirements) connected to all practically available
    roof area to maximise rainwater harvesting, reduce stormwater flows and reduce potable water demand.

>   Bio-retention basins.

>   Bio-retention gardens within the road reserve.

>   Bio-retention tree pits within the road reserve.

>   Bio-retention swales.

>   Vegetated swales.
>   Litter baskets.

>   Buffer areas.

>   Revegetation and rehabilitation of Lake Weyba buffer area.
>   Rehabilitation of Keyser Creek waterway corridor.

>   Reticulated water and sewerage, which will minimise the risk of contaminants from effluent                  being
    discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed rainwater
tanks will be able to provide around 82 percent of the non-potable water demand and around 53 percent of
the total water demand of the site.

MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met.     The reduction in        pollutant loads being   achieved     by the proposed   stormwater treatment train is

significantly greater than the reduction typically provided by standard residential developments.
The resultant pollutant loads from developed areas of the site are less than those resulting from the existing
rural use of these areas. Other areas of the site will be converted from rural uses to park areas and densely

vegetated areas will become designated conservation areas, and rehabilitated as required. Therefore the
overall stormwater quality being discharged from the site will likely be improved, and there will not be an

impact on the water quality of Lake Weyba.

Regular water quality monitoring will be used to ensure that stormwater being discharged from site is of
suitable quality.




Northbrook Corporation Pty Ltd                            Version 2                                   29 November 2012

SMP_v2.docx                                       Commercial in Confidence                                    Page 23

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.