~,.., Cardno@
The proposed rainwater tanks have a total volume of 6.375 ML. The daily usage is on average 0.282
ML/day, or 103.1 ML/year. The proposed tanks supply around 84.5 ML/year of this non-potable demand.
Therefore the total flow being treated or removed will be greater than that modelled without the rainwater
tanks in place.
8.4 Waterway Stability
The waterway stability objective is met as the peak flows from the site have been reduced to existing case
levels for all ARI events up to and including the 100 year ARI event (refer Flood Study, Cardno, October
2012). This is due to the attenuation being provided by the proposed road crossings and detention basins.
The attenuation provided by the rainwater tanks and bio-retention basins was not included in this analysis.
Therefore the attenuation, particularly for minor events, will likely be greater than reported.
Bio-retention basins and rainwater tanks provide some attenuation of minor peak flows, typically up to the 2
year ARI event. The outlets of the bio-retention basins and gardens should have adequate scour protection
installed to prevent downstream erosion.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.