                                                                                  CJ~Cardno

INTRODUCTION
         The water quality treatment proposed for the Noosa on Weyba development includes a number of bio-
         retention basins and gardens. This appendix provides an overview of their maintenance requirements.
         The litter baskets installed on the field inlets will also need   regular maintenance.    An example of a
         manufacturer’s maintenance requirements for litter baskets is attached.




Bio-retention Basin and Gardens Maintenance Requirements


Inspection Frequency
         Routine inspections should be undertaken on the bio-retention basins and gardens after every
         significant rainfall event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within
         the first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
         inspection for the bio-retention basins shall include the following:
              .     Check for build-up of sediment at pipe inlet structures, remove as required;

              .     Check all concrete structures for damage and deterioration;

              .     Check for the build-up of vegetation matter on the bed surface and removal of vegetation
                    matter to ensure minimal blockage to media; and

              .     Check achieved flow rate through the media is maintained in accordance with the design
                    requirements.


Maintenance Frequency
         The bio-retention basins and gardens treat stormwater runoff through the principles of sedimentation
         and filtration. The systems are subject to deposition of sediment that is filtered through the media.


         Any accumulated litter including leaves and other debris shall be removed for the surface of the filter
         surface on an as required basis. Inspection and maintenance of the litter baskets should also be
         conducted at this stage. As noted above, the basins are to be inspected after every significant rainfall
         event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within the first twelve (12)
         months and on a six (6)monthly basis thereafter.


Data Collectionl Storage Requirements

         Inspection records will be required for comparison of the performance of the system. In order to assist
         this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared    by Healthy
         Waterways be adopted for the site. Copies of the completed checklist are to be forwarded to the
         Cardno (Old)Pty Ltd (or other consultant nominated by the Principal) and to be provided to SCRC at
         the expiry of the maintenance period.



Detailed Maintenance Procedure
         Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention system in
         and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive
         period of maintenance is during the plant establishment period (i.e. first two years) when weed
         removal and replanting may be required.


         It is also the time when high sediment loads may impact on plant growth and infiltration rates. For this
         reason, if they are not being used as temporary sedimentation basins, the bio-retention systems are
         initially to be turfed, with geotextile fabric protecting the filter media underneath. Vegetation can be
         introduced when construction has been completed on an appropriate percentage of the catchment
         draining to each bio-retention system. If initial turfing of the bio-retention systems is not considered
         practicable, then it is advised that the majority of the vegetation be screened off during the plant
         establishment phase. This can be done by installing temporary sedimentation fences or similar
         devices to separate the inlet and outlet zone from the remainder of the basin. The inlets and outlets
         should be located close together so that this can easily be managed.


Northbrook Corporation Pty Ud                                                                       29 November 2012

O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F   -
                                                 Maintenance Plan.docx                                       Page 1

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.