INTRODUCTION
The water quality treatment proposed for the Noosa on Weyba development includes a number of bio-
retention basins and gardens. This appendix provides an overview of their maintenance requirements.
The litter baskets installed on the field inlets will also need regular maintenance. An example of a
manufacturer’s maintenance requirements for litter baskets is attached.
Bio-retention Basin and Gardens Maintenance Requirements
Inspection Frequency
Routine inspections should be undertaken on the bio-retention basins and gardens after every
significant rainfall event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within
the first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
inspection for the bio-retention basins shall include the following:
. Check for build-up of sediment at pipe inlet structures, remove as required;
. Check all concrete structures for damage and deterioration;
. Check for the build-up of vegetation matter on the bed surface and removal of vegetation
matter to ensure minimal blockage to media; and
. Check achieved flow rate through the media is maintained in accordance with the design
requirements.
Maintenance Frequency
The bio-retention basins and gardens treat stormwater runoff through the principles of sedimentation
and filtration. The systems are subject to deposition of sediment that is filtered through the media.
Any accumulated litter including leaves and other debris shall be removed for the surface of the filter
surface on an as required basis. Inspection and maintenance of the litter baskets should also be
conducted at this stage. As noted above, the basins are to be inspected after every significant rainfall
event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within the first twelve (12)
months and on a six (6)monthly basis thereafter.
Data Collectionl Storage Requirements
Inspection records will be required for comparison of the performance of the system. In order to assist
this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared by Healthy
Waterways be adopted for the site. Copies of the completed checklist are to be forwarded to the
Cardno (Old)Pty Ltd (or other consultant nominated by the Principal) and to be provided to SCRC at
the expiry of the maintenance period.
Detailed Maintenance Procedure
Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention system in
and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive
period of maintenance is during the plant establishment period (i.e. first two years) when weed
removal and replanting may be required.
It is also the time when high sediment loads may impact on plant growth and infiltration rates. For this
reason, if they are not being used as temporary sedimentation basins, the bio-retention systems are
initially to be turfed, with geotextile fabric protecting the filter media underneath. Vegetation can be
introduced when construction has been completed on an appropriate percentage of the catchment
draining to each bio-retention system. If initial turfing of the bio-retention systems is not considered
practicable, then it is advised that the majority of the vegetation be screened off during the plant
establishment phase. This can be done by installing temporary sedimentation fences or similar
devices to separate the inlet and outlet zone from the remainder of the basin. The inlets and outlets
should be located close together so that this can easily be managed.
Northbrook Corporation Pty Ud 29 November 2012
O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F -
Maintenance Plan.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.