                                                                                 CJ~Cardno

         Inflow systems and overflow systems require careful monitoring, as these can be prone to scour and
         litter build up. Debris can block inlets or outlets and can be unsightly.


         The filter media will be inspected for sediment deposition of the bed of the bio-retention basins and
         removed as required.


         Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that may have
         formed on the surface of the filter media. A symptom may be that water remains ponded in the bio-
         retention basin for more than a few hours after a rain event.      Repair minor accumulations by raking
         away any mulch on the surface and scarifying the surface of the filter media between plants.   Any leaf
         litter should be removed to help maintain the surface porosity of the filter media.


         Ensure the   perforated pipes are not blocked to prevent filter media and plants from becoming
         waterlogged. A small steady clear flow of water may be observed discharging from the perforated
         pipe at its connection into the downstream pit some hours after rainfall. Note that smaller rainfall
         events after dry weather may be completely absorbed by the filter media and not result in flow. Sub-
         soil drainage lines are to be flushed with clean water as required to remove and blockage.



Vegetation Management
         Watering

         Regular watering of the bio-retention system vegetation is essential for successful establishment and
         healthy growth. The frequency of watering to achieve successful establishment will depend upon
         rainfall, maturity of planting stock and the water holding capacity of the soil.

         The following watering program should be adequate following the installation of vegetation:

              .     Week 1-2                       3 visits/week

              .     Week 3-6                       2 visits/week

              .     Week 7-12                      1 visit/week


         After the first three month period, watering may still be required, particularly during the first winter (dry
         period). Irrigation shall be undertaken in consultation with the Landscape Architect.

         Weed Control and Mulching


         Conventional surface mulching of the bio-retention systems with organic material like tanbark, should
         not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed
         away with a risk of blocking drains. Mulch that is not likely to float should be adopted.

         If weeds are observed within the bio-retention system they shall be removed. Weeding will generally
         involve manual removal of the species.


         Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where
         necessary a biodegradable erosion mat can be applied to the basin batters to help combat weed
         invasion and reduce the labour intensive maintenance requirements for weed removal.


         Herbicides are not recommended as a means of weed control. If required, however, their application
         is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals
         that may contaminate the stormwater runoff.


         Where necessary, in areas that have been extensively weeded, the bio-retention system shall be
         replanted with similar planting densities using suitable native species in accordance with the
         Landscape Architects design.

         Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be
         removed and    replaced with suitable native species in accordance with the Landscape Architects
         design.

Northbrook Corporation Pty Ud                                                                        29 November 2012

O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F   -
                                                 Maintenance Plan.docx                                         Page 2

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.