Council archive · source document
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208
Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
CJ~Cardno
Inflow systems and overflow systems require careful monitoring, as these can be prone to scour and
litter build up. Debris can block inlets or outlets and can be unsightly.
The filter media will be inspected for sediment deposition of the bed of the bio-retention basins and
removed as required.
Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that may have
formed on the surface of the filter media. A symptom may be that water remains ponded in the bio-
retention basin for more than a few hours after a rain event. Repair minor accumulations by raking
away any mulch on the surface and scarifying the surface of the filter media between plants. Any leaf
litter should be removed to help maintain the surface porosity of the filter media.
Ensure the perforated pipes are not blocked to prevent filter media and plants from becoming
waterlogged. A small steady clear flow of water may be observed discharging from the perforated
pipe at its connection into the downstream pit some hours after rainfall. Note that smaller rainfall
events after dry weather may be completely absorbed by the filter media and not result in flow. Sub-
soil drainage lines are to be flushed with clean water as required to remove and blockage.
Vegetation Management
Watering
Regular watering of the bio-retention system vegetation is essential for successful establishment and
healthy growth. The frequency of watering to achieve successful establishment will depend upon
rainfall, maturity of planting stock and the water holding capacity of the soil.
The following watering program should be adequate following the installation of vegetation:
. Week 1-2 3 visits/week
. Week 3-6 2 visits/week
. Week 7-12 1 visit/week
After the first three month period, watering may still be required, particularly during the first winter (dry
period). Irrigation shall be undertaken in consultation with the Landscape Architect.
Weed Control and Mulching
Conventional surface mulching of the bio-retention systems with organic material like tanbark, should
not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed
away with a risk of blocking drains. Mulch that is not likely to float should be adopted.
If weeds are observed within the bio-retention system they shall be removed. Weeding will generally
involve manual removal of the species.
Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where
necessary a biodegradable erosion mat can be applied to the basin batters to help combat weed
invasion and reduce the labour intensive maintenance requirements for weed removal.
Herbicides are not recommended as a means of weed control. If required, however, their application
is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals
that may contaminate the stormwater runoff.
Where necessary, in areas that have been extensively weeded, the bio-retention system shall be
replanted with similar planting densities using suitable native species in accordance with the
Landscape Architects design.
Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be
removed and replaced with suitable native species in accordance with the Landscape Architects
design.
Northbrook Corporation Pty Ud 29 November 2012
O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F -
Maintenance Plan.docx Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.