Minor Change Existing Approval 51983 3225 21 [As Published] · 51983.3225.21
40. The Fig tree, Umbrella, Exotic and Palm trees as shown on Plan No. 18-4767AA prepared
by Max Watterson & Associates may be removed within the lot as part of preparing the site
for construction.
41. Any vegetation to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Privacy
42. The level 1 and level 2 operable timber privacy screens when fully extended must not cover
more than 50% of each of the balconies. The privacy screens on Level 3 must be a minimum
height of 1.7m above the FFL.
43. The balcony located on Level 2 and the roof top terrace must include balustrading (set back
as shown on the approved plans), and fixed external screens (where appropriate), positioned
in such a way to obscure direct views into the habitable room windows or private open space
areas of the adjoining units.
Building Appearance
44. The building must be constructed to be generally in accordance with the material and colour
palette as shown on Plan no. SD.102, Issue P2 and prepared by Gerard Smith Design.
Additional Conditions specific for Lot 3 GTP 1154 – 16 November 2023
Performance Bond - Planning
45. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, specifically
for Lot 3, prior to the issue of a Development Permit for Building Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Landscaping
46. The development site must be landscaped generally in accordance with the approved plans
of 16 November prepared by Earth Creation Landscapes and Planning Scheme Policy PSP2
– Landscaping.
47. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
48. All planting areas on the rooftop must be planted and maintained at all times, with
replacement planting undertaken promptly where plants fail or do not have a healthy and
vigorous growth.
49. Any vegetation to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Page 13 of 18
Document Set ID: 23671723
Version: 4, Version Date: 03/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 51983 3225 21 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 202 KB (small file)
- File type
No other editions are linked here.